Page images
PDF
EPUB
[blocks in formation]

15 ($000)

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

0 (PEOPLE)

[ocr errors]

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

N/A
($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

N/A
($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested
Communications Equipment

3080

FY 83

Cost ($000)

1,030

[ocr errors][merged small][merged small][merged small]

1. COMPONENT

2. DATE

FY 19 83 MILITARY CONSTRUCTION PROGRAM
Air Force
3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTA

COST INDEX
CLARK AIR BASE, REPUBLIC
OF THE PHILIPPINES

PACIFIC AIR FORCES

1.00 6. PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH:

ENLISTED

TOTAL

OFICER

ENUSTED

CIVILIAN

ENLISTED

CIVILIAN

OFFICER

OWLAN

[blocks in formation]

CODE

PROJECT TITLE

SCOPE

[ocr errors]

START

May 82

Aug 82

STANIURD LIBRARIE:

COMPLETE 721-312 Alter Unaccompanied Enlisted 828 PN 3,350 Aug 81 May 82

Personnel Housing 811-145 Upgrade Power Plant

10,000 KW 11,030 Sep 81

Sep 82 (Phase II) Subtotal-Major Construction

14,380 211-159 Aircraft Corrosion Control 11,000 SF

330 Sep 81 Jul 82 Facility (See Page 77) 442-758 Repairable Assets Control 14,000 SF 710 Sep 81

Center

(See Page 77) 510-001 Add to and Alter Composite

LS

276 Dec 81
Medical Facility (See page 78 )
Subtotal-Minor Construction
(Specified)

1,316
Total

15,696
9. Future Projects: (a) Included in Following Program (FY 84):
200-000 Various Maintenance

LS 2,900
Facilities (Phase I)
219-900 Replace BCE Facility (WAS) 5,975 SF 665
442-257 Base Hazardous Storage

5,600 SF 450
724-415 Alter Unaccompanied Officer 64 PN 1,350

Personnel Housing
Total

5,365
(b) Typical Planned Next Three Years:
218-212 Consolidated Support

30,000 SF 2,470
Equipment Facility
Mission or Major Functions: Tactical fighter wing with T-33, CT-39,
F-4E, F-4G, and F-5E aircraft; a tactical airlift wing with C-130E aircraft
an aerospace rescue and recovery detachment with HH-3 and CH-3 aircraft; an
aeromedical airlift squadron with C-9 aircraft; USAF Regional Hospital; a
Numbered Air Force Headquarters.

10.

DD FORM 1390 SUPPLEMENTAL DATA
FY 198 3 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

CLARK AIR BASE, RP

INSTALLATION/LOCATION

PACAF COMMAND

($000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

2,633
2,633

0

[merged small][ocr errors]

). )

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

810-XXX

Electrical Power Facilities

3,215 SF
Vacant spaces in 3 separate buildings previously housed
emergency generators. Besides being too far removed from
the primary electrical power plant, none of these buildings
are large enough to accom odate a primary power generator.

[blocks in formation]
[ocr errors]

1 COMPONENT

2. DATE
FY 19.83 MILITARY CONSTRUCTION PROJECT DATA
AIR FORCE
3. INSTALLATION AND LOCATION

4. PROJECT TITLE

ALTER UNACCOMPANIED ENLISTED CLARK AIR BASE, PHILIPPINES

PERSONNEL HOUSING 5. PROGRAM ELEMENT 6 CATEGORY CODE 7 PROJECT NUMBER 8. PROJECT COST (SO00)

[blocks in formation]

STANIURD LIBRARIE,

10. DESCRIPTION OF PROPOSED CONSTRUCTION
All electrical, structural, and mechanical work necessary to upgrade
existing housing to acceptable standards of livability. Includes upgrade
of central latrines, interroom noi.se attenuation, improved personnel safety
and energy conservation features. Also includes bedrooms, closets,
lounges, centralized storage, laundry, and support space.
Grade Mix: 828 E1-E4.
11. ON BASE REQUIREMENT: 2897 PN ADEQUATE: 697 PN SUBSTANDARD: 3568 PN
PROJECT: Alter six existing unaccompanied enlisted housing facilities.
REQUIREMENT: A na jor Air Force objective is to provide unaccompanied
enlisted personnel with housing that will be conducive to their proper
rest, relaxation and personal well being. Properly designed and furnished
quarters which provide some degree of individual privacy are essential to
the successful accomplishment of the increasingly complicated and important
jobs these personnel must perform. The lack of such quarters is an irri-
tant to these personnel and a known contributor to low re-enlistment rates.
The Air Force should remove this irritant to maintain an effective force
of experienced airmen.
CURRENT SITUATION: The facilities to be upgraded have inadequate
lighting, poor insulation and sound attenuation, obsolete electrical and
mechanical systems and central latrines. This project is phase two of a
six phase program which will eventually provide upgraded quarters to meet
the full programming need for the base. When this project is completed,
$3% of that goal will be reached.
IMPACT IF NOT FUNDED: Sub-standard living conditions will persist at the
pase and the morale, productivity and career satisfaction of the enlisted
force will continue to be degraded.
DD

DEC

MAY

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

[ocr errors][merged small]

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY. .IF.NEW.FACILITY. IS. A REPLACEMENT...

NA

(5000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

NA

($000)

[blocks in formation]

Aug 81

35

100 May 82

C.

d.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($000)

None

DD, 13910

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO BU.s. G.P.O. 1977-241-130/12 15

90-276 0-82—-44

« PreviousContinue »