Page images
PDF
EPUB
[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.............

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

E. DESIGN DATA (Estimated)

10

($000)

9

(PEOPLE)

N/A

($000)

N/A
($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F.

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE

PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

FORM

DD, 1391c PREVIOUS EDITION IS OBSOLETE IN THE USAF.

[blocks in formation]

10. Mission or Major Functions: The mission of this base is to support an Air National Guard tactical fighter squadron of F-106s and Combat Support Group, a Strategic Air Command missile warning squadron and a communications squadron.

[blocks in formation]

ΝΑ

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

[blocks in formation]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

1. Air Pollution

Quantity/Unit of
Measure

O SF
NA

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

10. DESCRIPTION OF PROPOSED CONSTRUCTION

Reinforced concrete footings, beams, floor slabs, roof and walls, special air conditioning for environmental control, raised computer flooring, fire protection systems, Radio Frequency Interference (RFI) shielding, utilities, communications ducts and necessary support. Includes radome disk antenna foundation and equipment facility containing communications, power, battery, cable tray, maintenance and supply areas; access roads and site Air Conditioning improvements.

[ocr errors]

26 Tong

II. REQUIREMENT: 3,000 SF ADEQUATE: 0 SUBSTANDARD: 0 PROJECT: Construct a satellite communications ground terminal. REQUIREMENT: Properly sized and configured facilities are required to house a Defense Satellite Communications System (DSCS) ground terminal. The DSCS provides long distance communications with a Jam Resistant Secure Communications (JRSC) system to support critical command, control, intelli gence, and warning activities, as well as the National Command Authorities The DSCS is an important component in the worldwide defense communications system and must be able to provide rapid and reliable service. This terminal will be an essential link in the missile warning network and will handle traffic in both voice and data modes.

CURRENT SITUATION: Currently, there is no DSCS terminal for this site. Existing long distance communications links to NORAD are now routed throug various circuits via leased terrestrial links and commercial satellite links. These circuits do not provide essential JRSC features and do not provide an adequate, survivable and non-vulnerable communications network. IMPACT IF NOT PROVIDED: The DSCS will continue to rely on the vulnerable leased circuits for critical warning and assessment communications.

90-276 0-82--42

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

NA

($000)

ΝΑ

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY......

ΝΑ

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

ΝΑ

($000)

[blocks in formation]

F.

a.

[blocks in formation]

No

X

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]
[blocks in formation]

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE

PROVIDED FROM OTHER APPROPRIATIONS:

Dec 82 (month and year)

[blocks in formation]
« PreviousContinue »