Page images
PDF
EPUB
[blocks in formation]

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTR

COST INDEX
BUCKLEY AIR NATIONAL GUARD BASE,
COLORADO

AIR NATIONAL GUARD

1.10 6. PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH:

TOTAL

[ocr errors]

ENLISTED

CIVILINE

[ocr errors]

ENLIITED

CIVILIAN

OFICER

[ocr errors]

CIVILIAN

[merged small][ocr errors][merged small][merged small][merged small][ocr errors][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

10.

Mission or Major Functions: The mission of this base is to support an Air Guard Tactical Fighter Wing and Combat Support Group, a Space and Missile System Organization for the Air Force Systems Command and a Comunications Squadron.

[subsumed][ocr errors][merged small][merged small][merged small][merged small][merged small]

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

BUCKLEY AIR NATIONAL GUARD BASE, COLORADO

INSTALLATION/LOCATION

AFSC COMMAND

($000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR) :

[merged small][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

1 COMPONENT

2. DATE FY 19 83 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3 INSTALLATION AND LOCATION

4. PROJECT TITLE

SATELLITE COMMUNICATIONS BUCKLEY AIR NATIONAL GUARD BASE, COLORADO GROUND TERMINAL 5 PROGRAM ELEMENT 6 CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST (5000)

[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION Reinforced concrete footings, beams, floor slabs, roof and walls, special air conditioning for environmental control, raised computer flooring, fire protection systems, Radio Frequency Interference (RFI) shielding, utilities, communications ducts and necessary support. Included radome disk antenna foundation and equipment facility containing communications, power, battery, cable tray, maintenance and supply areas; access roads and site improvements. Air Conditioning-20 Tons 11. REQUIREMENT: 1,700 SF. Adequate: 0. Substandard: 0. PROJECT: Construction of a satellite communications ground terminal. REQUIREMENT: Properly sized and configured facilities are required to house a Defense Satellite Communications System (DSCS) Ground terminal. The DSCS provides long distance communications with a Jam Resistant Secure Communications (JRSC) system to support critical command, control, intelligence, and warning activities, as well as the national command authorities. CURRENT SITUATION: Currently, there is no DSCS terminal for this site. Existing long distance communications links to NORAD are now routed through various circuits via leased terrestrial links and commercial satellite links. These circuits do not provide essential JRSC features and do not provide an adequate, survivable and non-vulnerable communica

tions network. This project will provide a new ground terminal to properly support NORAD operational requirements with missile warning data through the DSCS. IMPACT IF NOT PROVIDED: The DSCS will continue to rely on the vulnerable leased circuits for critical missile warning and assessment communications.

FORM

1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO

356

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.....

9

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

NA
($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

N/A
($000)

[blocks in formation]

Jul 81

85

C. d.

Feb 2

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost (5000)

[blocks in formation]
« PreviousContinue »