[blocks in formation]

2,255
($000)

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY....

45 (PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

N/A ($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT,

N/A ($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($000)

[merged small][merged small][ocr errors][merged small][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTR

COST INDEX UNITED STATES AIR FORCE ACADEMY,

UNITED STATES AIR COLORADO

RORCE ACADEMY

0.98 6 PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH:

OFTICE

TOTAL

ELETED

CIVILAN

[ocr errors]

CIVILI

ONLUTIO

CIVILIAN

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

171-000 Airmanship Training Facilities LS

3,000 Sep 81 760-111 Visitors Center

15,000 SF 3,050 Jul 81 Subtotal-Major Construction

6,050 211-000 OSH-Safety Guards

LS

630 Apr 81 (See Page 31 ) 721-000 OSH-Fire Detection Sys (See page32) LS 950 May 81 740-000 Alter Community Support Center LS

600

Dec 81 (See Page 32 ) 800-000 Energy Conservation

LS

900 Nov 81
(See Page 33 )
Subtotal-Minor Construction
(Specified)

3,080
Total

9,130 9. Future Projects: Included in following program (FY 84):

Jun 82

100-000 Various Operations Facilities LS 2,400 211-152 Alter Aero Club Facilities

LS

103 740-236 Addition to Chapel

LS

167 740-236 Chapel Access Elevator

LS

465 800-000 Energy Conservation

LS

430 880-221 Automatic Fire Detection Systems LS

774 TOTAL

4,339 10. Mission or Major Functions: Air Force Academy Headquarters and

training facility for Air Force Cadets; an Air Training Command flying training unit of T-41 trainer aircraft; a tenant unit.

DD 1390

FORM 1 DEC

PREVIOUS EDITION IS OOSOLETE IN THE USAF.

LAGEN

346

DD FORM 1390 SUPPLEMENTAL DATA
FY 198 3 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

UNITED STATES AIR FORCE ACADEMY, COLORADO

INSTALLATION/LOCATION

USAFA COMMAND

(5000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

3,681

(3,861

Permanent Facilities
Temporary Facilities

) )

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

2. DATE

1 COMPONENT

FY 19.83 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION

4. PROJECT TITLE

UNITED STATES AIR FORCE ACADEMY, COLORADO AIRMANSHIP TRAINING FACILITIES 5. PROGRAM ELEMENT 6 CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST (S000)

[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION
Reinforced concrete footings, floor slabs, walls and roofs with gravel
built-up roofs for addition to parachute shop, sailplane maintenance dock,
and hangars. Pre-engineered metal building with reinforced concrete
footings and floor slab for paratraining aids shelter; steel tower, swing
landing and harness trainers, fall platforms and associated equipment.
Two underground POL storage tanks complete with pumps and piping.
Airfield pavements including auxiliary runway and access road consisting
of compacted gravel, ramp and taxiway with compacted base course and bitu-
minous surface treatment. Administrative and classroom support areas with
all electrical, structural and mechanical work necessary to provide
complete and usable facilities. Utilities and other necessary support.
11. REQUIREMENT: As Required
PROJECT: Construction of new and alteration of existing facilities to
accommodate expanded airmanship training program.
REQUIREMENT : The expanded parachute and soaring training programs at the
Academy require new, enlarged and altered facilities to provide adequate
support for airmanship training. These include expanded parachute shop,
new maintenance dock, auxiliary runway with ramp, taxiway and access road
to separate motorgliders from tow plane and sailplane traffic.
CURRENT SITUATION: The current soaring training program is being expanded
from 300 to 1,200 students and the parachute training program is being
increased from 500 to 924 students per year. The existing sailplane fleet
bf 15 gliders will be increased by 8 new powered gliders. The existing
runway is already congested and lacks adequate turn-around facilities to
handle the increased soaring program. The auxiliary runway will relieve
the congestion on the existing runway and provide the necessary student
DD. 1391