Reinforced concrete foundation and floor slab, masonry walls, steel roof, built-up roofing, utilities and necessary support. Construction includes space for personnel equipment, life support equipment, scheduling, auditorium, briefing rooms, vault, flight planning, and weapon systems flight administrative areas. Air Condition 70 tons

11. REQUIREMENT: 95,800 SF ADEQUATE: 77,800 SF SUBSTANDARD: 8,400 SF PROJECT: Construct a squadron operations facility to accommodate an additional F-16 squadron and increased A-10, F-4, F-15, and F-16 training requirements.

REQUIREMENT: Adequate space is required for the 57th Fighter Weapons School (FWS) F-16 operations and A-10, F-4, F-15, F-16 academic training. At Nellis, TAC's best pilots are trained in the latest tactics and applications. Upon returning to their home station they teach these tactics and applications to other pilots.

CURRENT SITUATION: Space is not available to accommodate the new F-16 squadron operations. 57 FWS academic training is located in the 57 Wing Headquarters facilities. An expansion and restructing of the academic curiculum increased the training requirements for A-10, F-15 and F-4 pilots attending the FWS. At the same time the F-16 training syllabus was added to accommodate these actions, the FWS expanded taking over space occupied by the Director of Operations (DO). To accommodate the dislocated DO functions other organizations were forced to double up.

IMPACT IF NOT PROVIDED: If facilities are not available, the crowded split conditions will continue reducing training and mission effectiveness.

90-276 0-82--39

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..........

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

98

($000) 0

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

[merged small][merged small][ocr errors]

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

N/A

($000)

[blocks in formation]
[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION

Construct various facilities for the tactical range to include a Television Ordnance Scoring System (TOSS) and radar support facilities, an electronic warfare supply warehouse, roads and a water well.

11. REQUIREMENT: As Required.

PROJECT: Provides facilities to support expanded and improved Red Flag range operations at Nellis AFB.

REQUIREMENT: Properly located facilities are required for the installation of a TOSS and an Integrated Air Defense System radar. A warehouse is required for the proper storage and issue of supplies and equipment. A water well is required for the maintenance of range roads. CURRENT SITUATION: A facility is not available at sufficient elevation (6,500 feet MSL) on Quartz Mountain for the installation of TOSS cameras monitoring live ordnance firing on Ranges 75 and 76. Access road and support facilities are not available on Quartz Mountain for the erection and operation of the Integrated Air Defense System radars. Supplies and equipment for six Tolicha Peak electronic warfare facilities are shipped twice a week from Nellis AFB. Each 165 mile trip with deliveries requires two days. Limited supplies are stored in the work areas, with a minimum inventory control to reduce equipment downtime and emergency trips. Range 63 roads are merely trails which are impassable during and often after rainstorms. Lack of access to Range 63 equipment sites causes delays or postponement of Strategic and Tactical Air Force Operational and Test Evaluations. Because of the lack of a water source in Kawich Valley, water is trucked 25 miles over rough terrain to support road maintenance. This is extremely costly in terms of time, labor, vehicle wear and tear, and fuel.

[blocks in formation]

IMPACT IF NOT PROVIDED:

available.

5. PROJECT NUMBER

10373

Improved aircrew training capability will not be

Daily operations and maintenance of the ranges will continue to be accomplished in an inefficient manner resulting in an unnecessary range inaccessability and equipment downtime.

[blocks in formation]

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITI.....

5. NINGER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY.

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT

E. DESIGN DATA (Estimated)

1. STATUS

43 (5000)

0

(PEOPLE)

N/A (5000)

N/A (5000)

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS: