A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY...

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY......

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

[blocks in formation]

42

($000)

64 (PEOPLE)

N/A ($000)

N/A ($000)

Jun 80

100

100

Jan 81

4.

($000)

107

a.

b.

Production of Plans and Specifications.
All Other Design Costs.

[ocr errors][merged small]
[blocks in formation]

118

[blocks in formation]

F.

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]
[blocks in formation]

Reinforced concrete footings and floor slab, masonry walls, metal roof system with gravel built-up roof, utilities and necessary support. Includes gymnasium, exercise and locker rooms, latrines, sauna, mechanical and storage space.

1,660 SF

11. REQUIREMENT: 45,300 SF ADEQUATE: 22,100 SF SUBSTANDARD: PROJECT: Construction of an addition to the existing gymnasium. REQUIREMENT: Two gymnasiums are required to support the Mountain Home AFB athletic programs.

CURRENT SITUATION: The existing gymnasium is overtaxed. The demand for physical fitness activities cannot be met. The one available gym floor cannot satisfy the demand for basketball, volleyball, and both male and female exercise programs. Personnel desiring physical activities normally provided by a gymnasium facility are discouraged from participation. IMPACT IF NOT PROVIDED: Continued limited participation by military personnel in essential physical exercise programs.

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

67 ($000)

Ω

(PEOPLE)

NA ($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

[ocr errors][merged small]
[blocks in formation]

Sep 81

35

100

May 82

[blocks in formation]

($000)

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

Dec 82 (month and year)

Cost ($000)

Equipment Nomenclature

None

DD1391c

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO

DU.S. G.P.O. 1977-241-130/12 15

[blocks in formation]

10.

(b) Typical Planned Next Three Years: Aircraft Refueling Truck

Mission or Major Functions: This base hosts the USAF Tactical Fighter Weapons Center; a tactical fighter wing of F-16 aircraft, and a tactical training wing of F-4, F-5, F-15, F-16, A-10 and T-38 aircraft.

4 Stands 2,600

[blocks in formation]

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

NELLIS AIR FORCE BASE, NEVADA
INSTALLATION/LOCATION

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

[blocks in formation]

TAC COMMAND

($000)

4336.8

[blocks in formation]
[blocks in formation]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]
[blocks in formation]
[blocks in formation]
« PreviousContinue »