A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY... B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 42 ($000) 64 (PEOPLE) N/A ($000) N/A ($000) Jun 80 100 100 Jan 81 4. ($000) 107 a. b. Production of Plans and Specifications. 118 F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Reinforced concrete footings and floor slab, masonry walls, metal roof system with gravel built-up roof, utilities and necessary support. Includes gymnasium, exercise and locker rooms, latrines, sauna, mechanical and storage space. 1,660 SF 11. REQUIREMENT: 45,300 SF ADEQUATE: 22,100 SF SUBSTANDARD: PROJECT: Construction of an addition to the existing gymnasium. REQUIREMENT: Two gymnasiums are required to support the Mountain Home AFB athletic programs. CURRENT SITUATION: The existing gymnasium is overtaxed. The demand for physical fitness activities cannot be met. The one available gym floor cannot satisfy the demand for basketball, volleyball, and both male and female exercise programs. Personnel desiring physical activities normally provided by a gymnasium facility are discouraged from participation. IMPACT IF NOT PROVIDED: Continued limited participation by military personnel in essential physical exercise programs. MAY A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 67 ($000) Ω (PEOPLE) NA ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE Sep 81 35 100 May 82 ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Dec 82 (month and year) Cost ($000) Equipment Nomenclature None DD1391c PREVIOUS EDITION IS OBSOLETE IN THE USAF. PAGE NO DU.S. G.P.O. 1977-241-130/12 15 |