Page images
PDF
EPUB
[blocks in formation]

A.

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY,...

63
($000)

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY...

[ocr errors][merged small]

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

N/A
($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT

N/A
($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost
($000)

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

CATEGORY

COST

PROJECT TITLE

SCOPE

Apr 82

DESIGN STATUS CODE

1SO001 START COMPLETE 21-154 Aircraft Maintenance

13,000 SF 1,700 JUIT 80 Jan 81 Unit Facility 740-674 Add to

Gymnasium

23, 200 SF 2,650 Subtotal-Major Construction

4,350 171-618 Add to Field Training 8,600 SF 750 May 81 Feb 82

Facility (See Page 38) 812-926 Aircraft Maintenance Area

LS

940 Oct 81
Lighting (See Page 39)
Subtotal-Minor Construction
(Specified)

1,690
Total

6,040 9. Future Projects: (a) Included in Following Program (FY 84): 131-113 Addition Telephone

2,400 SF 530 Exchange 171-212 Addition Flight Simulator 6,175 SF 1,520

Facility 217-812 Electronic Warfare Support 7,200 SF 910

Facility 740-884 Child Care Center

5,065 SF 800 Total

3,760
(b) Typical Planned Next Three Years:
721-312 Alter Unaccor
anied Enlisted LS

1,650
Personnel Housing
Mission or Major Functions: This base hosts a tactical fighter wing of
F-lll aircraft and an aerospace rescue and recovery squadron detachment of
UH-1 aircraft.

[ocr errors]

10.

DD FORM 1390 SUPPLEMENTAL DATA
FY 198 3 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

MOUNTAIN HOME AFB, IDAHO

INSTALLATION/LOCATION

TAC
COMMAND

($000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

3955.6

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

3. Safety and Occupational Health

2758

[ocr errors]

1

COMPONENT

2. DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3 INSTALLATION AND LOCATION

PROJECT TITLE

AIRCRAFT MAINTENANCE MOUNTAIN HOME AIR FORCE BASE. IDAHO

UNIT FACILITY 5 PROGRAM ELEMENT 6 CATEGORY CODE 7 PROJECT NUMBER 8 PROJECT COST (5000)

4

[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION Reinforced concrete footings and floor slab, insulated sound-deadening masonry walls, steel joists with built-up roof. Utilities and necessary support. Includes loose equipment and tool kit storage, tool crib, bench stock, support equipment maintenance, classrooms, remote maintenance crew stations, administration, and mechanical space. 11. REQUIREMENT: 27,000 SF ADEQUATE: 14,000 SF SUBSTANDARD: 5,010 SF PROJECT: Construct an aircraft maintenance unit (AMU) facility for the EF-111A. REQUIREMENT: Provide shop and office space to support the assignment of an EF-111A squadron and its maintenance personnel. An AMU is required to expedite accomplishment of maintenance and increase flight training time. Space provides an area for mechanics to work out of and storage for their equipment and supplies. A secure area is required for the storage of tool kits. High value aircraft parts must be stored in a secure environment. Space is also necessary for the maintenance and repair of test equipment. CURRENT SITUATION: AMU functions for the new mission will be housed in temporary buildings and trailers until completion of this project. Overcrowded conditions will prevail. Effective accomplishment of maintenance under such conditions is impractical without adverse impact upon the flight training of this new mission. IMPACT IF NOT PROVIDED: Accomplishment of maintenance will be less efficient and less effective without adequate facilities to house AMU personnel, tools, and equipment.

MAY

COMPONENT

2. DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

64

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

N/A
($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

N/A
($000)

[blocks in formation]

Jun 80

100 100 Jan 81

2.

BASIS

No X

a.
b.

Standard or Definitive Design Yes
Where Design Was Most Recently Used

STANFORD LIBRARIE:

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost
($000)

None

DD, 1391c

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO
BU.S. G.P.O. 1977-241.1 30/12 15

« PreviousContinue »