Reinforced concrete footings, foundation and floor slab, pre-engineered metal building complete, fire protection systems, utilities and necessary support. Includes weapon release bays, radar calibration, shop, training, storage, administrative and mechanical space. Air Conditioning - 20 Tons 11. REQUIREMENT: 21 Spaces ADEQUATE: 17 SUBSTANDARD: 0 PROJECT: Construct a four bay small aircraft maintenance dock for assigned F-4s. REQUIREMENT: Covered space is required to perform maintenance, adjustments, inspections, repairs, and modifications on 72 F4 aircraft. Adequate space must be available to permit scheduled accomplishment of these activities in an environment not subject to the elements (rains, heat, dust, etc.). CURRENT SITUATION: There are currently seventeen covered spaces at Moody to support 72 F4s. The lack of adequate covered spaces forces personnel to perform maintenance on sophisticated technical weapon systems on the ramp. IMPACT IF NOT PROVIDED: Aircraft maintenance will be performed on parking aprons without adequate utility support, protection from the elements, or working environment for critical maintenance tasks. A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.... B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 63 ($000) 0 (PEOPLE) N/A ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE Jun 81 85 100 Apr 82 AF Definitive ($000) ( 98 F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature None Procuring Fiscal Year 113 211 100 (111 Dec 82 (month and year) Cost ($000) FORM DD 1391c PREVIOUS EDITION IS OBSOLETE IN THE USAF. BU.S. G.P.O. PAGE NO 1977-241-130/1215 10. (b) Typical Planned Next Three Years: Alter Unaccompanied Enlisted Mission or Major Functions: This base hosts a tactical fighter wing of F-111 aircraft and an aerospace rescue and recovery squadron detachment of UH-1 aircraft. LS 1,650 AIR FORCE DD FORM 1390 SUPPLEMENTAL DATA FY 198 3 MILITARY CONSTRUCTION PROGRAM MOUNTAIN HOME AFB, IDAHO TAC COMMAND ($000) 3955.6 A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR): C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS: 1. Air Pollution 2. Water Pollution 3. Safety and Occupational Health Quantity/Unit of 0 0 0 0 0 ($000) 0 ($000) 2758 ($000) Reinforced concrete footings and floor slab, insulated sound-deadening masonry walls, steel joists with built-up roof. Utilities and necessary support. Includes loose equipment and tool kit storage, tool crib, bench stock, support equipment maintenance, classrooms, remote maintenance crew stations, administration, and mechanical space. 11. REQUIREMENT: 27,000 SF ADEQUATE: 14,000 SF SUBSTANDARD: 5,010 SF PROJECT: Construct an aircraft maintenance unit (AMU) facility for the EF-111A. REQUIREMENT: Provide shop and office space to support the assignment of an EF-111A squadron and its maintenance personnel. An AMU is required to expedite accomplishment of maintenance and increase flight training time. Space provides an area for mechanics to work out of and storage for their equipment and supplies. A secure area is required for the storage of tool kits. High value aircraft parts must be stored in a secure environment. Space is also necessary for the maintenance and repair of test equipment. CURRENT SITUATION: AMU functions for the new mission will be housed in temporary buildings and trailers until completion of this project. Overcrowded conditions will prevail. Effective accomplishment of maintenance under such conditions is impractical without adverse impact upon the flight training of this new mission. IMPACT IF NOT PROVIDED: Accomplishment of maintenance will be less efficient and less effective without adequate facilities to house AMU personnel, tools, and equipment. MAY |