Reinforced concrete footings, foundation and floor slab, pre-engineered metal building complete, fire protection systems, utilities and necessary support. Includes weapon release bays, radar calibration, shop, training, storage, administrative and mechanical space. Air Conditioning - 20 Tons 11. REQUIREMENT: 21 Spaces ADEQUATE: 17 SUBSTANDARD:

0 PROJECT: Construct a four bay small aircraft maintenance dock for assigned F-4s.

REQUIREMENT: Covered space is required to perform maintenance, adjustments, inspections, repairs, and modifications on 72 F4 aircraft. Adequate space must be available to permit scheduled accomplishment of these activities in an environment not subject to the elements (rains, heat, dust, etc.).

CURRENT SITUATION: There are currently seventeen covered spaces at Moody to support 72 F4s. The lack of adequate covered spaces forces personnel to perform maintenance on sophisticated technical weapon systems on the

ramp.

IMPACT IF NOT PROVIDED: Aircraft maintenance will be performed on parking aprons without adequate utility support, protection from the elements, or working environment for critical maintenance tasks.

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

63

($000)

0

(PEOPLE)

N/A ($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT....

[ocr errors][merged small]
[blocks in formation]

Jun 81

85

100

Apr 82

AF Definitive

($000)

( 98

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Nomenclature

None

Procuring
Appropriation

Fiscal Year
Appropriated
Or Requested

113

211

100 (111

Dec 82 (month and year)

Cost

($000)

FORM

DD 1391c

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

BU.S. G.P.O.

PAGE NO 1977-241-130/1215

[blocks in formation]

10.

(b) Typical Planned Next Three Years: Alter Unaccompanied Enlisted

Mission or Major Functions: This base hosts a tactical fighter wing of F-111 aircraft and an aerospace rescue and recovery squadron detachment of UH-1 aircraft.

LS

1,650

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 198 3 MILITARY CONSTRUCTION PROGRAM

MOUNTAIN HOME AFB, IDAHO
INSTALLATION/LOCATION

TAC COMMAND

($000)

3955.6

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

[merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

1. Air Pollution

2. Water Pollution

3. Safety and Occupational Health

Quantity/Unit of
Measure

[ocr errors]

0

0

0

0

0

($000)

0

($000)

2758

($000)

[blocks in formation]

Reinforced concrete footings and floor slab, insulated sound-deadening masonry walls, steel joists with built-up roof. Utilities and necessary support. Includes loose equipment and tool kit storage, tool crib, bench stock, support equipment maintenance, classrooms, remote maintenance crew stations, administration, and mechanical space.

11. REQUIREMENT: 27,000 SF ADEQUATE: 14,000 SF SUBSTANDARD: 5,010 SF PROJECT: Construct an aircraft maintenance unit (AMU) facility for the EF-111A.

REQUIREMENT: Provide shop and office space to support the assignment of an EF-111A squadron and its maintenance personnel. An AMU is required to expedite accomplishment of maintenance and increase flight training time. Space provides an area for mechanics to work out of and storage for their equipment and supplies. A secure area is required for the storage of tool kits. High value aircraft parts must be stored in a secure environment. Space is also necessary for the maintenance and repair of test equipment. CURRENT SITUATION: AMU functions for the new mission will be housed in temporary buildings and trailers until completion of this project. Overcrowded conditions will prevail. Effective accomplishment of maintenance under such conditions is impractical without adverse impact upon the flight training of this new mission.

IMPACT IF NOT PROVIDED: Accomplishment of maintenance will be less efficient and less effective without adequate facilities to house AMU personnel, tools, and equipment.