Page images
PDF
EPUB
[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

5.

C.

D.

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

35 (3000)

2

(PEOPLE)

N/A (5000)

N/A (5000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[ocr errors]

30 Tons

Reinforced concrete footings and floor slab, structural steel frame, masonry walls, steel joists with gravel built-up roof, special air conditioning for environmental control, raised computer flooring, fire protection systems, utilities and necessary support. Includes computer and remote terminal rooms, tape library, supply, storage, maintenance and administrative areas Air Conditioning 11. REQUIREMENT: 8,080 SF ADEQUATE: 0 SUBSTANDARD: 4,160 SF PROJECT: Construction of a new data processing facility. REQUIREMENT: A properly sized and configured facility is required to house the new Phase IV computer. The Phase IV computer acquisition program affects every USAF installation and represents a $50 million annual savings Air Force-wide by replacing obsolete Burroughs 3500/3700/4700 and Univac 1050-II computers. It is necessary to support essential weapon system maintenance and supply activities, and permit more effective management of personnel, financial, engineering, and equipment resources at base level. The computer system is scheduled for delivery in May 1984.

CURRENT SITUATION: The two existing computers to be replaced by the Phase IV computer are located in two separate facilities. The current physical limitation of these facilities will not permit installation of the new Phase IV computer. There is no other facility available that meets the required space criteria. Construction of a new facility is necessary to adequately accommodate the new computer equipment and associated support functions.

IMPACT IF NOT PROVIDED: We will have no place to house the expensive new computers now on order.

[blocks in formation]

3.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY...

11

(5000)

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

136 ($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

1,536
(500))

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

Dec 82

(month and year)

Cost (S000)

2,300

*Equipment to be leased with 3400 funds from date of delivery until purchased

DD, FOR 1391c

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

0 2,550

[blocks in formation]

Projects: (a) Included in Following Program (FY 84):
Sound Suppressor Support
Flightline Supply Facility
Vehicle Operations Facility
Total

1 EA 32,000 SF 4,150 SF

726

1,970

350 3,046

[blocks in formation]

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 198 3 MILITARY CONSTRUCTION PROGRAM

MOODY AIR FORCE BASE, GEORGIA
INSTALLATION/LOCATION

TAC COMMAND

($000)

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

23046

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]

Quantity/Unit of
Measure

0

[merged small][merged small][merged small][merged small][merged small][ocr errors]
« PreviousContinue »