Page images
PDF
EPUB

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

HOMESTEAD AIR FORCE BASE, FLORIDA
INSTALLATION/LOCATION

TAC COMMAND

($000)

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

[blocks in formation]

2076-5

[blocks in formation]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]

Quantity/Unit of
Measure

0

($000)

0 ($000)

1,380

($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Reinforced concrete footings and floor slab, structural steel frame, masonry walls, steel joists with gravel built-up roof, special air conditioning for environmental control, raised computer flooring, fire protection systems, utilities and necessary support. Includes computer and remote terminal rooms, tape library, supply, storage, maintenance and administrative areas. Air Conditioning - 45 Tons 11. REQUIREMENT: 8,080 SF ADEQUATE: 0 SUBSTANDARD: 9,510 SF PROJECT: Construction of a new data processing facility. REQUIREMENT: A properly sized and configured facility is required to house the new Phase IV computer. The Phase IV computer acquisition program affects every USAF installation and represents a $50 million annual savings Air Force-wide by replacing obsolete Burroughs 3500/3700/4700 and Univac 1050-II computers. It is necessary to support essential weapon system maintenance and supply activities, and permit more effective management of personnel, financial, engineering, and equipment resources at base level. The computer system is scheduled for delivery in May 1984. CURRENT SITUATION: The two existing computers to be replaced by the Phase IV computer are located in two separate facilities. The current physical limitation of these facilities will not permit installation of the new Phase IV computer. There is no other facility available that meets the required space criteria. Construction of a new facility is necessary to adequately accommodate the new computer equipment and associated support functions.

IMPACT IF NOT PROVIDED: We will have no place to house the expensive new Computers now on order.

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

234

($000)

0

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

5,855

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

6.505

($000)

[blocks in formation]

b. Where Design Was Most Recently Used Air Force Definitive

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

Fiscal Year

Appropriated
Or Requested

1985*

Jan 83 (month and year)

Cost

($000)

2,400

* Equipment to be leased using 3400 funds from date of delivery until purchased.

FORM

DD, 1391c

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

DU.S. G.P.O.

PAGE NO 1977-241-130/12 15

[blocks in formation]

17,890

[blocks in formation]

Projects: (a) Included in Following Program (FY 84):

211-183

Sound Suppressor Support

442-758

Base Supply Complex

[blocks in formation]

1 EA 82,000 SF

LS

Total

630

5,000

130 5,760

721-312

Personnel Housing

740-673 Field House and Track

(b) Typical Planned Next Three Years: Alter Unaccompanied Enlisted 238 PN

10. Mission or Major Functions: This base hosts Headquarters, Tactical Air Command, a tactical fighter wing of F-15 aircraft, and a fighter interceptor squadron of F-106 and T-33 aircraft.

2,450

[blocks in formation]

AIR FORCE
COMPONENT

DO FORM 1390 SUPPLEVETAL JAIA

FY 1933 MILITARY CONSTRUCTION PROGRAM

LANGLEY AIR FORCE BASE, VIRGINIA
INSTALLATION/

TAC

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (3MAR):

(5730)

4,276.5

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

C. OUTSTANDING POLLUTION AND SAFETY (OSEA) PROJECTS:

[blocks in formation]
« PreviousContinue »