Page images
PDF
EPUB
[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY....

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY. IF.NEW.FACILITY. .I.S. A REPLACEMENT.

N/A

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT

N/A
($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost
(5000)

None

DD, CORY 13910

PREVIOUS EDITIONIS OBSOLETE IN THE USAF.

PAGE NO
BU.S. G.P.O. 1977-241.130/1219

2 DATE

1 COMPONENT

FY 1983 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3 INSTALLATION AND LOCATION

4. PROJECT TITLE

[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION
Reinforced concrete frame building, concrete floors and roof, concrete
foundation, masonry walls, solar heated domestic hot water, fire protec-
tion system, utilities and necessary support. Includes bedrooms, baths,
closets, centralized storage, laundry, and support space.
11.
REQUIREMENT : 656 PN ADEQUATE: 136 PN

SUBSTANDARD: 0
PROJECT: Construction of new visiting officer quarters.
REQUIREMENT: Adequate on-base living quarters are required to house unac-
companied officer personnel assigned to Vandenberg in a temporary duty
status. On-ba se quarters are needed to insure these officers are provided
an environment conducive to rest and personal well-being and, in the case
bf students, proper study so they can meet the rigid requirements of the
various training programs conducted at the base.
CURRENT SITUATION: The existing 136 spaces are not sufficient to handle
the increase in average daily transient load forecast because of increased
mission responsibilities at the base. The increases are related to major
programs such as the Space Shuttle and the Global Positioning Satellite
|(GPS).
IMPACT IF NOT PROVIDED: A shortage of adequate space to house visitors to
the base will continue to exist.

[merged small][ocr errors][merged small][merged small][merged small]
[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

0 (PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY. IF.NEW.FACILITY.IS . A .REPLACEMENT.

N/A ($ 000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

N/A
($000)

[blocks in formation]
[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($000)

None

DD, FORM

13910

1 DEC

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO

U.S. G.P.O.

1977

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTA

COST INDEX

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

AIR FORCE COMPONENT

VARIOUS LOCATIONS

INSTALLATION/LOCATION

SAC COMMAND

($000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

N/A

)

[blocks in formation]
[ocr errors]
[blocks in formation]
« PreviousContinue »