Page images
PDF
EPUB
[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.....

0 (PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY. IF. NEW. FACILITY. IS. A REPLACEMENT

N/A

00)

D.

[ocr errors]

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

N/A ($000)

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($000)

None

DD, but no 13910

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO BU.s. 6.P.O. 1977-141-130/12 15

[blocks in formation]

RANGE SAFETY PROCESSING CENTER

SF 32,000 145.00 4,640 SUPPORTING FACILITIES

1,019 ELECTRICAL

LS

( 300) MOTOR GENERATOR MODIFICATIONS

LS

( 90) UTILITIES

LS

( 25) SITE IMPROVEMENT

LS

(

35) SEISMIC AND SPECIAL FOUNDATIONS

LS

230) ROADS, PARKING AND WALKS

SY

7,500 18.50 ( 139) SPECIAL FIRE SUPPRESSION

LS

(

190) ACTIVE SOLAR APPLICATIONS

LS

( 10) SUBTOTAL

5,659 CONTINGENCY (5%)

283 TOTAL CONTRACT COST

5,942 SUPERVISION, INSPECTION AND OVERHEAD (5%)

297 TOTAL REQUEST

6,239 TOTAL REQUEST (ROUNDED)

6,200 EQUIPMENT PROVIDED FROM OTHER APPROPRIATIONS (NON-ADD)

(3,000) 10. DESCRIPTION OF PROPOSED CONSTRUCTION Reinforced concrete footings, foundation and floor slab, metal walls, structural steel frame and roof system with built-up roof, solar heated domestic hot water, special fire suppression systems, utilities and necessary support. Includes computer and storage and maintenance areas, technical support, storage, and mechanical space.

Air Conditioning 140 Tons 11.

REQUIREMENT: 630,000 SF ADEQUATE: 563,000 SF SUBSTANDARD: 35,000 SE PROJECT : Construction of a facility for a new Range Safety Processing Center (RSPC). REQUIREMENT : A major responsibility of the Western Space and Missile Center during Missile launch operations is the protection of life and property from errant or malfunctioning missiles. A highly reliable, fully redundant real time range safety computer system and associated support equipment are required to provide necessary launch vehicle performance data to the Missile Flight Control officer who must decide when and where to destroy errant missiles. The Range Safety Processing Center (RSPC) is needed to provide the permanent facility to house the new Metric Data Processing System (MDPS), associated classified magnetic media storage and operations/maintenance personnel which will perform this function. The RSPC must be collocated with the Range Control Center to allow a central computer complex and eliminate classified data transmission problems. CURRENT SITUATION: The IBM 360/65 computer system currently used for real time range safety support is not fully redundant and inadequate to support MX and Space Shuttle launches. The absence of a fully redundant system requires waivers to safety criteria for real time range safety support. The MDPS must be operational before the existing system can be deactivated

MAY

2 DATE

1 COMPONENT

FY 1983 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION

VANDENBERG AIR FORCE BASE, CALIFORNIA

4. PROJECT TITLE

5. PROJECT NUMBER

RANGE SAFETY PROCESSING CENTER

10098

When the MDPS becomes operational the space housing the IBM 360/65 will be used for other telemetry validation and meteorological data processing systems. IMPACT IF NOT PROVIDED: Implementation of the MDPS will be seriously impaired. The system will be operated from a remote temporary facility as trailers requiring secure communications lines to the Range Control Center

(Bldg 7000) and transportation of classified magnetic media data. Support for the MX and Space Shuttle programs will be degraded.

[ocr errors][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

60
($000)

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

[ocr errors][merged small]

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

N/A
($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT....

[merged small][ocr errors]
[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

F.

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested
Metric Data Processing 3,400

FY 82 System

Cost
(5000)
3,000

DD, 601 13910

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO
U.S. G.P.0. 1977- neige

1 COMPONENT

2. DATE FY 19_83 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION

4 PROJECT TITLE

SPACE TRANSPORTATION SYSTEM (STS) VANDENBERG AIR FORCE BASE, CALIFORNIA FACILITY MODIFICATIONS 5 PROGRAM ELEMENT 6 CATEGORY CODE 7 PROJECT NUMBER 8 PROJECT COST (S000)

[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION Construct launch facility additions/ modifications such as gaseous oxygen vent hood arm, orbiter avionics simulator provisions, intermediate hypergolic spill accommodations, Access Tower thermal protection application, payload processing facility oxidizer load capability, launch pad environmental control system improvements, payload cabling provisions, emergency egress system installations, Mobile Service Tower platform relocation, and Solid Rocket Booster / External Tank preloading provisions. Alter various STS facilities to accommodate the

installation of equipment that will be used in direct support of the STS
mission. Includes various elements of construction and provides the
necessary additions/modifications for a complete and usable facility.
11. REQUIREMENT : As Required.
PROJECT:

Construction and modification to facilities for STS operations at Vandenberg AFB. REQUIREMENT: Adequate facilities are required to support Space Transportation System launch operations in a safe and reliable manner. Additions and modifications to existing and presently planned launch facilities are required to accommodate changes in system requirements, STS flight vehicle characteristics, and Payload/Spacecraft processing operations. These facilities modifications are part of the joint NASA-DOD effort, as directed by presidential Task Group in 1969 to provide an increased national capability for access to space. Adequate provisions in existing and newly constructed facilities must be made to permit the installation and operation of support equipment systems resulting from changes in STS program directives and requirements, STS flight vehicle elements, support equipment hardware configurations, and

operational procedures. Work includes change orders and valid changes that were previously authorized and were DD, 600 1391

2717

PREVIOUS EDITIONS MAY BE USED INTEANALLY

UNTIL EXHAUSTED

PAGE NO

« PreviousContinue »