AIR FORCE DD FORM 1390 SUPPLEMENTAL DATA FY 1983 MILITARY CONSTRUCTION PROGRAM MCCONNELL AIR FORCE BASE, KANSAS SAC COMMAND ($000) A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR): 3,945 C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS: Quantity/Unit of 0 SF ($000) 0 ($000) 0 3. Safety and Occupational Health ($000) Reinforced concrete footings and floor slab, masonry walls, truss roof, solar heated domestic hot water, utilities and necessary support. Includes dining and serving areas, kitchen and dishwashing space, storage and mechanical. Air Conditioning 90 Tons 11. REQUIREMENT: 17,500 SF ADEQUATE: 0 SUBSTANDARD: 29,700 SF PROJECT: Construct a new dining hall to replace the existing substandard facility. REQUIREMENT: A new enlisted dining facility is required with a pleasant dining area for patrons and a kitchen which provides for proper preparation of meals. CURRENT SITUATION: The lack of proper ventilation in the kitchen area presents a health hazard. Numerous fire violations exist in kitchen exhaust hoods and false ceilings, presenting serious safety hazards which must be corrected. Also related to personal safety, the perishable storage areas are totally inadequate. Limited refrigerated thawing area causes room temperature thawing of some foods, creating a dangerous environment which fosters the growth of harmful bacteria. In addition, the existing frozen food storage space is too small to accommodate the quantities of frozen foods required. The dining facility was designed to support the single entree concept employed 20 years ago. The serving line and kitchen equipment are poorly arranged and cannot effectively support today's cooking concept. The kitchen and dishwashing area open directly onto the serving and dining areas and present considerable noise disturbance to persons seated in the dining area. IMPACT IF NOT PROVIDED: Enlisted personnel will continue to be served by a substandard faciity. A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) 295 ($000) 0 (PEOPLE) N/A ($000) N/A ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring Fiscal Year Jan 83 (month and year) Cost ($000) 710 Dental Clinic Projects: (a) Included in Following Program (FY 84): 38,387 38,387 (b) Typical Planned Next Three Years: LS 10. Control Facilities Mission or Major Functions: Active mission support activities include an Air Division Headquarters responsible for management, command, control and direction of assigned Strategic Air Command units; a Heavy Bombardment Operational Wing including one B-52 squadron and one KC-135 squadron which maintains a bomber and tanker alert force; a Strategic Missile Wing consisting of three minuteman missile squadrons which maintain a continuous alert posture, and an Aerospace Defense Command F-106 Tenant Fighter Interceptor squadron performing air defense and maintaining an alert force. |