Page images
PDF
EPUB

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

GRAND FORKS AIR FORCE BASE, DAKOTA
INSTALLATION/LOCATION

SAC COMMAND

($000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

2,913

[blocks in formation]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

677

9. Future Projects: (a) Included in Following Program (FY 84): 317-000

High Speed Integrated

3,510 SF

[blocks in formation]

10.

Mission or Major Functions: Active mission support activities include a Heavy Bombardment Operational Wing including one B-52 squadron and one KC-135 squadron which maintains a bomber and tanker alert force; an Aerospace Defense Command F-106 Tenant Fighter Interceptor Squadron which performs air defense and maintains an alert force; an Air Force Systems Command tenant (Rome Air Development Center) which performs electronics research and development; and an Air Force Communications Service Tenant Northern Communications Area Headquarters performing design, programming, installation and maintenance of advanced communications systems.

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA
FY 198 3 MILITARY CONSTRUCTION PROGRAM

GRIFFISS AIR FORCE BASE, NEW YORK
INSTALLATION/LOCATION

SAC COMMAND

($000)

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

6.524

[blocks in formation]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

10. DESCRIPTION OF PROPOSED CONSTRUCTION All civil, structural, electrical and mechanical work necessary to construct a new coal-fired central heating facility. Includes four steam generators, coal handling system, coal yard, repair of existing railroad trackage, new trackage, ash/coal dust handling systems, environmental protection measures, repair existing or install new distribution lines, and all other utilities and support to provide a complete and usable facility/system.

11. REQUIREMENT: 400,000 MB ADEQUATE: 0 SUBSTANDARD: 400,000 MB PROJECT: Construction of a new coal fired central heating plant to replace aging facilities.

REQUIREMENT: A central heating plant with adequate capacity and distribution system is required to provide sufficient heat to essential mission and base support facilities. A coal fired plant is required to take advantage of the availability of coal as a reliable and least expensive source of fuel and eliminate our dependence of fuel oil which is in short supply. Environmental and occupational safety protection measures are also required.

CURRENT SITUATION: The existing central heating plant is oil fired and is nearly forty years old. Existing boilers are deteriorated and do not have adequate capacities to operate under peak loads. The distribution system is in need of major repair or replacement. The condition of the existing equipment requires costly maintenance.

IMPACT IF NOT PROVIDED: Without this project, the base heating facilities will continue their accelerated deterioration. Lack of sufficient heat will result precluding adequate heat supply to base facility. Continued dependence on oil and gas as a source of fuel for which we will run an lever increasing risk of shortage.

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.IF.NEW.FACILITY.IS .A „REPLACEMENT..

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

DESIGN DATA (Estimated)

224 ($000)

0

(PEOPLE)

NA

($000)

NA

($000)

E.

[blocks in formation]

F.

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE

PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]
« PreviousContinue »