Page images
PDF
EPUB

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

F.E. WARREN AIR FORCE BASE, WYOMING
INSTALLATION/LOCATION

SAC COMMAND

($000)

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

5,064

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]

Quantity/Unit of
Measure

0 SF

G ($000)

($000)

957

($000)

[blocks in formation]

11.

All electrical, structural, and mechanical work necessary to upgrade existing housing to acceptable standards of livability. Includes installation of baths, interroom noise attenuation, improved personnel safety and energy conservation features. Also includes bedrooms, closets, lounges, centralized storage, laundry, and support space. Grade Mix: 420 E1-E4. ON BASE REQUIREMENT: 962 PN ADEQUATE: 0 SUBSTANDARD: 1073 PN PROJECT: Alter four existing unaccompanied enlisted housing facilities. REQUIREMENT: A major Air Force objective is to provide unaccompanied enlisted personnel with housing that will be conducive to their proper rest, relaxation and personal well being. Properly designed and furnished quarters which provide some degree of individual privacy are essential to the successful accomplishment of the increasingly complicated and important jobs these personnel must perform. The lack of such quarters is an irritant to these personnel and a known contributor to low re-enlistment rates. The Air Force should remove this irritant to maintain an effective force of experienced airmen.

CURRENT SITUATION: The facilities to be upgraded were constructed in 1904-06. They have inadequate lighting, poor insulation and sound attenuation, obsolete electrical and mechanical systems and central latrines. This project is phase one of a three phase program which will eventually provide upgraded quarters to meet the full programming need for the base. When this project is completed, 44% of that goal will be reached. IMPACT IF NOT PROVIDED: Substandard living conditions will persist at the base and the morale, productivity and career satisfaction of the enlisted force will continue to be degraded.

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY...

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

50

($000)

0

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.IF. NEW FACILITY IS A. REPLACEMENT....

N/A ($000)

D.

E. DESIGN DATA (Estimated)

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

[ocr errors][merged small][merged small]
[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Nomenclature

Procuring
Appropriation

Fiscal Year
Appropriated
Or Requested

Dec 82
(month and
year)

Cost ($000)

[blocks in formation]
[blocks in formation]

Facility

411-135 510-001

Jet Fuel Storage

Add to and Alter Composite

Aircraft Corrosion Control 61,242 SF

100,000 BL 3,847 84,500 SF 19,500 Medical Facility/Dental Clinic

10. Mission or Major Functions: Active mission support activities include an Air Division Headquarters responsible for management, command, control and direction of assigned Strategic Air Command units; a Heavy Bombardment Operational Wing including one B-52 squadron and two KC-135 squadrons which maintains a bomber and tanker alert force; and an Air National Guard KC-135 Tenant Heavy Air Refueling Wing which performs training to maintain combat readiness, supports operational tanker requirements and maintains a tanker alert force.

4,056

AIR FORCE
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

FAIRCHILD AIR FORCE BASE, WASHINGTON
INSTALLATION/LOCATION

SAC COMMAND

($000)

3,437

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

[merged small][merged small][ocr errors][merged small][merged small][merged small]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]

Quantity/Unit of
Measure

OSF
OSF
NA

0

($000)

0

($000)

0 ($000)

« PreviousContinue »