Page images
PDF
EPUB
[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

0 (PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

6,122
($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

20,805

($000)

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($000)

Medical/Dental Equipment

3080

1984

5,900

COMPONENT

2. DATE FY 19.83 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3 INSTALLATION AND LOCATION

4. PROJECT TITLE

ALTER UNACCOMPANIED ENLISTED CARSWELL AIR FORCE BASE, TEXAS

PERSONNEL HOUSING 5 PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST (5000)

[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION

All electrical, structural, and mechanical work necessary to upgrade

existing housing to acceptable standards of livability. Includes installation of baths, interroom noise attenuation, improved personnel safety and energy conservation features. Also includes bedrooms, closets, lounges, centralized storage, laundry, and support space. Grade Mix: 432 El-E4. 11. ON BASE REQUIREMENT: 1280 PN ADEQUATE: 142 PN SUBSTANDARD: 1272 PN PROJECT: Alter three existing unaccompanied enlisted housing facilities. REQUIREMENT: A major Air Force objective is to provide unaccompanied

enlisted personnel with housing that will be conducive to their proper
rest, relaxation and personal well being. Properly designed and furnished
quarters which provide some degree of individual privacy are essential to
the successful accomplishment of the increasingly complicated and impor-
tant jobs these personnel must perform. The lack of such quarters is an
irritant to these personnel and a known contributor to low re-enlistment
rates. The Air Force should remove this irritant to maintain an effective
force of experienced airmen.
CURRENT SITUATION: The facilities to be upgraded were constructed in
1953/4. They have inadequate lighting, poor insulation and sound atten-
uation, obsolete electrical and mechanical systems and central latrines.
This project is phase two of a four phase program which will eventually
provide upgraded quarters to meet the full programming need for the base.
When this project is completed, 45% of that goal will be reached.

IMPACT IF NOT FUNDED: Substandard living conditions will persist at the
base and the morale, productivity and career satisfaction of the enlisted
force will continue to be degraded.

DD, DEC 1391

PAEVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO

230 =

COMPONENT

2. DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA) AIR FORCE 3. INSTALLATION AND LOCATION

[blocks in formation]

A.

B.

C.

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..... 1,059

($000) NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY.

0

(PEOPLE) ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE PROPOSED FACILITY. IF. NEW.FACILITY..19. A .REPLACEMENT..30,766

(5000) ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

34,954

($000) DESIGN DATA (Estimated)

D.

E.

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($000)

[blocks in formation]

1

COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROGRAM Air Force 3 INSTALLATION AND LOCATION

COMMAND

4

5. AREA CONSTA

COST INOEX

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][ocr errors][merged small][merged small][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

Major Construction

0 899-00A Air Pollution. Alter Jet Fuel

LS

750 Dec 81 May 82 Storage (See Page 24 ) Subtotal-Minor Construction (Specified)

750 Total

750 9. Future Projects: (a) Included in Following Program (FY 84): None

(b) Typical Planned Next Three Years: 130-835

Security Police Operations 9,724 SF 1,200

Facility 179-476 Small Arms Range Complex

LS

650 211-159

Aircraft Corrosion Control 38,500 SF 7,053

Facility 10. Mission or Major Functions: Active mission support activities include a Heavy Bombardment Operat ional Wing including a B-52 squadron which per

forms combat crew training, and two KC-135 squadrons, one which performs combat crew training and one which maintains an alert force; and an Aerospace Defense Command F-106 Tenant Fighter Interceptor Squadron which performs air defense and maintains an alert force.

DD.MM. 1390

PREVIOUS EDITIONIS OBSOLETE IN THE USAF.

PAGE NO

231

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

AIR FORCE
COMPONENT

CASTLE AIR FORCE BASE, CALIFORNIA

INSTALLATION/LOCATION

SAC COMMAND

($000)

A.

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

2,368

[merged small][merged small][subsumed][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
« PreviousContinue »