A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN E. DESIGN DATA (Estimated) 1. STATUS Standard or Definitive Design Yes X No b. Where Design Was Most Recently Used AF Definitive Design F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Acquisition of four parcels of privately owned land adjacent to the air base boundary. Also included is relocation of an entry control point and boundary fencing. 11. REQUIREMENT: As Required PROJECT: Acquisition of approximately 18.75 acres of land to improve base security. REQUIREMENT: This land is required to eliminate the intrusion of privately owned land along the primary road between the industrial and residential areas of the base. It is also needed to eliminate the operation and maintenance of one entry control point. CURRENT SITUATION: Currently, travel between the residential and industrial sides of the base, which are located on opposite sides of the runway, requires passage through privately owned land. The land extends deeply into the base's industrial area. This situation requires the operation of two entry control points at either end of the privately owned land. Each entry control point costs approximately $120,000 per year to operate. The present boundary situation also increases the possibility of intrusion to the flight line through the privately owned wedge of land during periods of alert and higher states of readiness. This project will eliminate one entry control point. IMPACT IF NOT PROVIDED: Continued imcompatible land use with continuing security risk. Base will continue to operate an additional entry control point. A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT N/A ($000) N/A (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE N/A ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: Cost ($000) PAGE NO U.S. G.P.O. 1977-241-130/12 15 740-675 Add to Library LS 21,700 10. Mission or Major Functions: This base supports Headquarters Military Airlift Command, Headquarters Air Force Communications Command, an aeromedi cal airlift wing, a reserve aeromedical airlift group, Headquarters Air Weather Service, a communications group headquarters, a Communications Service Facility checking squadron and USAF Environmental Technical Applications Center. DD FORM 1370 SUPPLEMENTAL DATA FY 1993 MILITARY CONSTRUCTION PROGRAM AIR FORCE SCOTT AIR FORCE BASE, ILLINOIS MAC COMAND (SOCO) A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (3MAR): Parmanent Facilities B. SITLAR UNUSED SPACE: Real Property Categories 214-XXX Vehicle Maintenance Facilities 510-XXX Medical Facilities 610-XXX Administrative Facilities 800-XXX Energy Conservation C. OUTSTANDING POLLUTION AND SAFETY (OSEA) PROJECTS: |