ESTIMATED COST OF BACKLOG OF MAINTENANCE 2] 22:2 (BAR): 907 C. OUTSTANDING POLLUTION AND SAFETY (OSEA) PROJEC:S: 1 COMPONENT 2. DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3 INSTALLATION AND LOCATION 4. PROJECT TITLE 10 DESCAIPTION OF PROPOSED CONSTRUCTION DD. 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO 204 ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..... 0.645 (5000) NUMBER OF ADDITIONAL PERSONEL NECESSARS TO CARRO CUT THE FUNCTION OF THE PROPOSED FACILITY. (PEOPLE) ESTIMATED LIFE-CYCLE COST TO OPERATE 1DIAT. IN THE PROPOSED FACILITY.IF. NEW. FACILITY. IS. A. REPLACEMENT... N/A (5000) ESTIMATED LIFE-CYCLE COST TO OPERATE AJ MAINTAIN THE EXISTING FACILITI IF NEW FACILITY IS A REPLACEE:I N/A (5000) DESIGN DATA (Estimated) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL 33 Fiscal Year Procuring Appropriated Or Requested Cost (5000) None DD097% 13910 PREVIOUS EDITION ISO9SOLETE THE USAF. PAGE NO 2. DATE 1. COMPONENT FY 19_83 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION PROJECT TITLE 4 10. DESCRIPTION OF PROPOSED CONSTRUCTION Reinforced concrete footings and floor slab, structural steel frame, masonry walls, steel joists with gravel built-up roof, special air conditioning for environmental control, raised computer flooring, fire protection systems, utilities and necessary support. Includes computer and remote terminal rooms, tape library, supply, storage, maintenance and administrative areas. Air Conditioning - 100 Tons 11. REQUIREMENT: 8,080 SF ADEQUATE: 0 SUBSTANDARD: 3,800 SF PROJECT: Construction of a new data processing facility. REQUIREMENT: A properly sized and configured facility is required to house the new Phase IV computer. The Phase IV computer acquisition program affects every USAF installation and represents a $50 million annual savings Air Force wide by replacing obsolete Burroughs 3500/3700/4700 and Univac 1050-II computers. It is necessary to support essential weapon system maintenance and supply activities, and permit more effective management of personnel, financial, engineering, and equipment resources at base level. This computer system is scheduled for delivery in August 1984. CURRENT SITUATION: The two existing computers to be replaced by the Phase IV computer are located in one facility. The current physical limitation of this facility will not permit installation of the new Phase IV computer. There is no other facility available that meets the required space criteria. Construction of a new facility is necessary to adequately accommodate the new computer equipment and associated support functions. IMPACT IF NOT PROVIDED: We will have no place to house the expensive computer now on order. DD 1 Dec 1391 PREVIOUS EDITIONS MAY BE USED IN TEANALLY UNTIL EXHAUSTED PAGE NO 205 142.7 (5000) B. N2333 OF ADDITIOA PERSOANEL NECESSAR? TO 0:22OSI 0 (P20?LE) N/A (5000) D. ESTINATED LIFE-CYCHE COST TO OPERATE - VITAS N/A (5000) 2. b. Standard or Definitive Design Yes X Yo F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WEICE TIL 33 Fiscal Year Procuring 4ppropriated Nouenclature Appropriation 0: Recues:ed Phase IV Computer 3080 Support Equipment Cost (5000) 1,900 DD, 0264 13910 PREVIOUS EDISION IS OBSOLETE ISTNI USA. PAGE NO. 1.$. 9...0. 1971-221.130/12S |