Page images
PDF
EPUB
[blocks in formation]

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR) :

40

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]

1

COMPONENT

2. DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA AIR FORCE 3. INSTALLATION AND LOCATION

4. PROJECT TITLE

CENTRALIZED AIRCRAFT SUPPORT COLUMBUS AIR FORCE BASE. MISSISSIPPI

SYSTEM 5 PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST (S000)

[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION Underground fiberglass duct air-start distribution system and underground encased duct electrical distribution system. Includes above ground compressed air generating and power generation plants and necessary support. 11. REQUIREMENT: 50 Service Points ADEQUATE: O SUBSTANDARD: 0 PROJECT: Construction of a centralized aircraft support system (CASS) to replace mobile ground equipment. REQUIREMENT: Compressed air and 400 cycle power are required for starting and maintaining aircraft on the flightline. In addition, 60 cycle power is also required for lighting and for operating hand tools. A fixed system is needed to provide this aircraft support and to eliminate the use of mobile ground support equipment. CURRENT SITUATION: Currently, mobile ground support equipment, including gas turbine compressors, generators, air compressors, and lights are used to support the starting and servicing of assigned aircraft. This old and deteriorating mobile equipment is towed around the flightline to needed

areas. The tow vehicles and the ground power equipment generate high noise levels, emit air pollution and are energy inefficient. The CASS system will replace this mobile equipment with several centrally located, easily maintained pieces of equipment which are quiet, clean and energy efficient. IMPACT IF NOT PROVIDED: The inefficient individual units will continue to be used.

MAY

[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

zero

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

NA
($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

NA
($000)

[blocks in formation]

Dec 80

60

Date Design Started.
Percent Complete as of January 1, 1982.
Percent Complete as of October 1, 1982.
Date Design Complete.

C. d.

100 May 81

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F.

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($000)

[blocks in formation]

1. COMPONENT

2. DATE

FY 19.83 MILITARY CONSTRUCTION PROGRAM Air Force 3. INSTALLATION AND LOCATION

4. COMMAND

5. AREA CONSTR

COST INDEX

AIR TRAINING COMMAND GOODFELLOW AIR FORCE BASE, TEXAS

,98 6. PERSONNEL

PERMANENT
STUDENTS

SUPPORTED
STRENGTH:

TOTAL

[ocr errors]
[ocr errors]

OPPICIA

CIVILIAN

[ocr errors]

OVILIAN

CODE

2. AS OF 30 Sept 81

68
837
301 23 1033 0

6

192 92,469 b END FY 19 87 67 845 311 23 1033 0

6 192 92,486

7. INVENTORY DATA ($000) ə, TOTAL ACREAGE (1,139) D. INVENTORY TOTAL AS OF 30 Sep 81

21,865 c. AUTHORIZATION NOT YET IN INVENTORY.

0 d. AUTHORIZATION REQUESTED IN THIS PROGRAM

15,300 e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM.

0 1. PLANNED IN NEXT THREE PROGRAM YEARS.

12,109 9. REMAINING DEFICIENCY

40,000 h. GRAND TOTAL

89.274 8. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY

COST

DESIGN STATUS PROJECT TITLE

SCOPE

15000)

START COMPLETE 171-611 Cryptologic Systems Main- 56,400 SF 4,300 Dec 81

Aug 82 tenance Training Facility 171-611 Special Intelligence

30,000 SF 3,600 Nov 81 Jul 82 Training Facility 721-312 Unaccompanied Enlisted

600 PN 7,400 Dec 81 Nov 82
Personnel Housing
Subtotal-Major Construction

15,300
Minor Construction.
(Specified)

0
Total

15,300 9. Future Projects: (a) Included in Following Program (FY 84): None

(b) Typical Planned Next Three Years: 219-944 Base Civil Engineer

1,500 SF 314 Maintenance Shop 721-312 Alter Unaccompanied Enlisted 200 PN

1,698 Personnel Housing 721-312 Unaccompanied Enlisted

652 PN 8,500 Personnel Housing 812-223 Alter Electric Distribution

LS

1,597 Systems 10. Mission or Major Functions: A technical training wing responsible for all cryptologic training provided to Air Force personnel and other Department of Defense agencies.

[blocks in formation]

ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

225

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
« PreviousContinue »