Page images
PDF
EPUB
[blocks in formation]
[blocks in formation]

10.

Mission or Major Functions: A Technical Training Center, which includes aircraft maintenance, aerospace ground equipment maintenance, missile maintenance, metals technology, fuels, weather, and fire fighting training.

[blocks in formation]

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR):

Permanent Facilities
Temporary Facilities

3,494

(3,494 ( 0

[blocks in formation]

C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS:

[blocks in formation]
[ocr errors]

Quantity/Unit of
Measure

0

N/A

0

($000)

10,000

($000)

75,000

($000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Reinforced concrete footings and floor slab, masonry walls, structural steel frame and laminated wood trusses with built-up roof. Utilities and necessary support. Includes gymnasium, handball courts, exercise and locker rooms, latrines, administrative, mechanical and storage space. Air Conditioning - 50 Tons 11. REQUIREMENT: 75,000 SF ADEQUATE: 0 SUBSTANDARD: 107,700 SF PROJECT: Construction of a new gymnasium to meet the physical conditioning needs of both male and female personnel. REQUIREMENT: Functional and adequately-sized gymnasiums are an essential feature of the living and working environment of personnel on an Air Force base. Physical well-being and good morale, resulting in part from facilities providing for exercise, team and individual sports, are essential to the development and retention of personnel.

CURRENT SITUATION: Presently gymnasium activities on the base are housed in a wooden structure built in 1942 and a converted aircraft hangar built in 1941. These facilities are so poorly configured that they cannot provide sufficient activities to maintain balanced athletic programs. They are in very poor condition and cannot be upgraded to provide adequate showers, locker rooms or game courts. Due to the inadequate number of courts and support areas, many personnel are turned away, and the number of athletic programs is limited despite careful scheduling and use of waiting lists. No gymnasium exists on base that meets acceptable standards. IMPACT IF NOT PROVIDED: Benefits from the physical conditioning program will continue to be limited due to the unsatisfactory facilities available and the limited number of personnel that can be accommodated.

MAY

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY......

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

46

($000)

7

(PEOPLE)

NA ($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

[ocr errors][merged small][merged small]
[blocks in formation]

Jan 81

95

100 Mar 82

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Nomenclature

Procuring
Appropriation

Fiscal Year
Appropriated
Or Requested

Dec 82

(month and year)

Cost

($000)

None

FORM

DD, 1391c

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

PAGE NO

« PreviousContinue »