A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY...

B.

C.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

17.5

($000)

0 (PEOPLE)

N/A ($000)

N/A

Ꭰ . ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.
NOTE: REFERENCE FY 83 MCP JOINT NAVY/AIR FORCE UNACCOMPANIED
ENLISTED PERSONNEL HOUSING (UEPH P-199 NAS MOFFETT FIELD).
E. DESIGN DATA (Estimated) NAVY IS THE RESPONSIBLE O&M AGENCY AND WILL

1. STATUS

THE ($000)

ASSUME FUNDING RESPONSIBILITY IN ACCORDANCE
WITH DOD POLICY.

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]
[blocks in formation]

10.

Mission or Major Functions: Air Force Satellite Control facility for orbiting DOD satellites.

[merged small][merged small][merged small][merged small][ocr errors]

190.8

A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (EMAR):

[blocks in formation]

C. OUTSTANDING POLLUTION AND SAFETY (OSEA) PROJECTS:

[blocks in formation]

Quantity/Sait of
Measure

None

[ocr errors][merged small]

3. Safety and Occupational Health

0

(5000)

[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION Reinforced concrete footings, foundation and floor slab, steel walls, structural steel frame and roof system, utilities and necessary support. All structural, electrical and mechanical work required to provide an efficient, functional data systems modernization. Includes reconfigured mission control complexes and automatic data processing equipment areas. Air Conditioning 400 Tons 11. REQUIREMENT: 339,460 SF ADEQUATE: 239,960 SF SUBSTANDARD: 39,500 SF PROJECT: Provides additions/alterations to Mission Control Complexes (MCCS) and automatic data processing equipment areas in Technical Operations Buildings as required to accept new equipment being procured under the Data Systems Modernization (DSM) Program for the Satellite Test Center. REQUIREMENT: An equipment and software acquisition ($235 million) will upgrade the Air Force Satellite Control Facility (AFSCF) capabilities so that it can continue its unique mission into the 1990s. Obsolete flight support computers, control/display consoles and data processing equipment will be replaced under the DSM program. CURRENT SITUATION: Existing technical equipment/operations spaces are not configured to accommodate the new equipment and additional space is required. Initial equipment installation scheduled to begin in FY 83. The new equipment will be delivered in increments - existing equipment must remain completely operational until the new equipment and systems are in place and fully tested/validated. The equipment will be installed and furnished by the Contractor.

IMPACT IF NOT PROVIDED: It will be impossible to install the Data Systems Modernization equipment. The AFSCF will be unable to support missions of

highest national priority (Rating 1-1).

1. COMPONENT

2. DATE

FY 1983 MILITARY CONSTRUCTION PROJECT DATA

AIR FORCE

3. INSTALLATION AND LOCATION

SUNNYVALE AIR FORCE STATION, SUNNYVALE, CALIFORNIA 4. PROJECT TITLE

5. PROJECT NUMBER

ADD TO AND ALTER SATELLITE CONTROL FACILITY

SUPPLEMENTAL DATA

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

424

($000)

100

(PEOPLE)

N/A ($000)

[ocr errors]

Ꭰ .

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

N/A

($000)

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

($000)

364 108) 472

44

428)

Apr 83 (month and year)

Cost ($000)

249.5

PAGE NO