DD FORM 1390 SUPPLEMENTAL DATA AIR FORCE TINKER AIR FORCE BASE, OKLAHOMA AFLC COMMAND ($000) A. ESTIMATED COST OF BACKLOG OF MAINTENANCE AND REPAIR (BMAR): 8,522 C. OUTSTANDING POLLUTION AND SAFETY (OSHA) PROJECTS: All structural, electrical and mechanical work required to provide efficient and functional hangars. Includes special fire suppression systems in aircraft maintenance docks, with associated water supply and drainage system, steam and condensate lines integrated with steam distribution system, conversion to steam heating system, and electrically driven hangar doors, utilities and necessary support. 11. REQUIREMENT: 1,034,000 SF/ADEQUATE: 456,800 SF/SUBSTANDARD: 577,200 SF PROJECT: Alteration of four existing depot aircraft maintenance hangars to install adequate heating/ventilation and fire suppression systems. REQUIREMENT: Safe and efficient aircraft maintenance facilities are required for protection of 1,750 people working in these facilities and millions of dollars worth of equipment worked on daily. Requirement includes proper wall configuration constructed of fire retardant materials, safe ventilation, electrical systems and controls to eliminate numerous occupational safety, health and fire hazard violations. Modifications of the doors in two hangars are necessary to permit safe operation. open gas flame forced air heating system must be replaced to meet safety requirements. The CURRENT SITUATION: These facilities do not have the minimum level of protection from fire and explosion. Four types of aircraft are worked on daily. The existing deluge system is ineffective against a fire in an enclosed space. The aircraft docks have manually operated 35 foot high doors with no ice build-up protection. The gas fired heating in one hangar is 38 years old and cannot effectively heat the facility. IMPACT IF NOT PROVIDED: The facility will continue to be used with the safety violation uncorrected. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) 40 ($000) 0 (PEOPLE) N/A ($000) N/A ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Reinforced concrete frame building, concrete floors and roof, concrete foundation, masonry walls, air conditioning, fire protection system, utilities and necessary support. Includes bedrooms, baths, closets, lounges, centralized storage, laundry, and support space. Grade Mix: 144 E1-E4. Air Conditioning - 120 Tons 11. ON BASE REQUIREMENT: 1,505 PN ADEQUATE: 200 PN SUBSTANDARD: 836 PN PROJECT: Construction of a new unaccompanied enlisted housing facility. REQUIREMENT: A major Air Force objective is to provide unaccompanied enlisted personnel with housing that will be conducive to their proper rest, relaxation and personal well being. Properly designed and furnished quarters which provide some degree of individual privacy are essential to the successful accomplishment of the increasingly complicated and important jobs these personnel must perform. The lack of such quarters is an irritant to these personnel and a known contributor to low re-enlistment rates. The Air Force should remove this irritant to maintain an effective force of experienced airmen. CURRENT SITUATION: There are currently not enough facilities to accommodate the on base requirement. This project is phase two of a five phase program which will eventually provide upgraded quarters to meet the full programming need for the base. When this project is completed, 23% of that goal will be reached. IMPACT IF NOT FUNDED: Adequate living quarters for unaccompanied enlisted personnel, grades E-1 through E-4, will continue to be unavailable resulting in degradation of morale, productivity, and career satisfaction. MAY A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..... 10 ($000) (PEOPLE) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT 0 C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE N/A ($000) N/A ($000) F. 4. CONSTRUCTION START. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring Fiscal Year Dec 82 (month and year) Cost ($000) |