DD Form 1390 Supplemental Data FY 1983 Military Construction Program AIR FORCE MATHER AIR FORCE BASE, CALIFORNIA INSTALLATION/LOCATION A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981) AIR TRAINING COMMAND ($000) B. Similar Unused Space: Real Property Categories Permanent Facilities C. Outstanding Pollution and Safety (OSHA) Deficiencies: Quantity/Unit of ($000) RESERVE TENANT UNIT PROJECT 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a permanent training facility with reinforced concrete foundation and floor slab, masonry walls, and built-up roof using modern construction methods and material. Functional areas include offices for unit commanders, administrative and training rooms, and space for storage of equipment and tools, latrines, and mechanical equipment room. All utilities and necessary support. Air Conditioning: 20 Tons 11. REQUIREMENT: 7,000 SF ADEQUATE: 0 SUBSTANDARD: 4,202, SF PROJECT: Construction of a composite training facility to house the Reserve Civil Engineering Squadron and Communications-Electronics Training Flight. REQUIREMENT: A facility of adequate size and configuration is required to effectively administer the staff and reserve training functions of these two units. CURRENT SITUATION: These reserve units are presently housed in portions of two wood frame buildings over 40-years old. Space is inadequate and improperly laid out for proper span of control and training of personnel. Both buildings waste energy, cannot be upgraded because of their deteriorated condition and are scheduled for disposal as soon as they can be vacated. IMPACT IF NOT PROVIDED: Lack of adequate facilities will continue to hamper reserve training and achievement of desired readiness. FORM 1 DD DEC 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO. 5-8 A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.. B. C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 19 (3000) (PEOPLE) 912 (3000) 328 (3000) DEC 81 0 100 SEP 82 F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: APR 83 month and year) Cost ($000) PREVIOUS EDITION IS OBSOLETE IN THE USAF. 1. COMPONENT USAFR 3. INSTALLATION AND LOCATION FY 19 83GUARD AND RESERVE PETERSON AIR FORCE BASE, COLORADO 5. FREQUENCY AND TYPE UTILIZATION 2. DATE 1 JAN 82 4. AREA CONSTR COST INDEX .98 Facility is used daily. Unit training assembly is two days per month. Annual field training is 15 days per year. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS Ft Carson 8 miles |