DD Form 1390 Supplemental Data

FY 1983 Military Construction Program

AIR FORCE
COMPONENT

MATHER AIR FORCE BASE, CALIFORNIA

INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981)

AIR TRAINING COMMAND
COMMAND

($000)

B. Similar Unused Space:

Real Property Categories

Permanent Facilities
Temporary Facilities

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

[blocks in formation]

Quantity/Unit of
Measure

($000)

RESERVE TENANT UNIT PROJECT

[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a permanent training facility with reinforced concrete foundation and floor slab, masonry walls, and built-up roof using modern construction methods and material. Functional areas include offices for unit commanders, administrative and training rooms, and space for storage of equipment and tools, latrines, and mechanical equipment room. All utilities and necessary support. Air Conditioning: 20 Tons

11. REQUIREMENT: 7,000 SF ADEQUATE: 0 SUBSTANDARD: 4,202, SF PROJECT: Construction of a composite training facility to house the Reserve Civil Engineering Squadron and Communications-Electronics Training Flight.

REQUIREMENT: A facility of adequate size and configuration is required to effectively administer the staff and reserve training functions of these two units.

CURRENT SITUATION: These reserve units are presently housed in portions of two wood frame buildings over 40-years old. Space is inadequate and improperly laid out for proper span of control and training of personnel. Both buildings waste energy, cannot be upgraded because of their deteriorated condition and are scheduled for disposal as soon as they can be vacated.

IMPACT IF NOT PROVIDED: Lack of adequate facilities will continue to hamper reserve training and achievement of desired readiness.

FORM

1

DD DEC 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO. 5-8

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..
NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

B.

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.....

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..................
E. DESIGN DATA (Estimated)

[blocks in formation]

19

(3000)

(PEOPLE)

912

(3000)

328

(3000)

DEC 81

0

100

SEP 82

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE

PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

APR 83 month and year)

Cost ($000)

PREVIOUS EDITION IS OBSOLETE IN THE USAF.

[blocks in formation]

1. COMPONENT

USAFR

3. INSTALLATION AND LOCATION

FY 19 83GUARD AND RESERVE
MILITARY CONSTRUCTION

PETERSON AIR FORCE BASE, COLORADO

5. FREQUENCY AND TYPE UTILIZATION

2. DATE

1 JAN 82

4. AREA CONSTR COST INDEX

.98

Facility is used daily. Unit training assembly is two days per month. Annual field training is 15 days per year.

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS Ft Carson

8 miles

[blocks in formation]
[blocks in formation]

MAY