Page images
PDF
EPUB
[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

$ 209,000

0

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

N/A

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.

N/A

[blocks in formation]

F.

[blocks in formation]

EQUIPMENT ASSICIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Procuring

Fiscal Year
Appropriated

(month and year)

Cost

None

[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Four Unit Training Assemblies per month, 15 days Annual Field Training per year, daily use by Technician Force and for training.

6 OTHER ACTIVE GUARD RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

Alcoa Air National Guard Station, 1 Air Force Reserve, 3 Army National
Guard Armories, 1 Marine Corp Reserve, 1 Naval Reserve, 1 Coast Guard
Reserve

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]

PAGE NO 4-101

[blocks in formation]

10

DESCRIPTION OF PROPOSED CONSTRUCTION

Construction: Concrete foundation and floor slab, masonry walls with steel frame and built-up roof.

Area Includes: Group Commander, Combat Support, Director of Operations, Resources, Administrative, Audio-visual Processing and Training, Toilet Facilities and Mechanical Equipment Room.

AIR CONDITIONING - 80 Tons

11. REQUIREMENT: 19,600 SF. ADEQUATE: -0-. SUBSTANDARD: 15,041 SF. PROJECT: A composite facility to provide all necessary functions for Headquarters support of the 134th Air Refueling Group and tenant units. REQUIREMENT: The facility is required to provide adequate space for the Group Commander, Deputy Commander for Resources, Deputy Commander for Operations and the Combat Support Squadron functions and each of the Commanders Staff. Administrative Processing, Audio-Visual Processing and Training of Reservists will be conducted in this facility during day-today operation and during unit training assemblies.

CURRECT SITUATION: The functions are located in various base buildings which are substandard. The space is inadequate in size and design to properly organize the cohesive unit required to support the 134th Air Refueling Group.

IMPACT IF NOT PROVIDED: Continued operations in inadequate facilities and overcrowded working conditions will continually reduce efficiency and severely impair the mission of the 134th Air Refueling Group.

Existing facilities will be used to satisfy current space deficiencies in other functional areas.

MAY

ANG

COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

McGhee Tyson Aprt, Knoxville, TN
INSTALLATION/LOCATION

A.

ESTIMATE COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR):

[blocks in formation]

($000)

315

« PreviousContinue »