Page images
PDF
EPUB
[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..

$203,000

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

0

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

N/A

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.....

N/A

[blocks in formation]

F. EQUIPMENT ASSICIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

4/83 (month and year)

Equipment

None

Procuring

Fiscal Year
Appropriated

Cost

[blocks in formation]

Four Unit Training Assemblies per month, 15 days Annual Field Training per year, daily use by technician force and for training.

6

OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

3 Army National Guard, 6 Army Reserve, 1 Naval Reserve

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Site survey has been completed and site is suitable for constructing the proposed project at the estimated cost indicated.

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]
[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION Concrete foundation and floor slab,

masonry walls, built-up roof. Squadron operations facility to house all
associated functions of a flying squadron operation to include command post
The
special electronic warfare mission, stand evaluation, intelligence.
facility will include a telecommunications function to house a complete
communication squadron. AIR CONDITIONING: 60 tons

REQUIREMENT: 29,177 SF. ADEQUATE : -0-. SUBSTANDARD: -0-.
PROJECT: A combination facility containing a C-130EC special electronic
warfare mission flying squadron and a telecommunication squadron.
REQUIREMENT: The facility scope is based on a special mission requirement,

CURRENT SITUATION: The existing functions are located in facilities that are in need of major rehabiliation. The heating and air conditioning are inadequate. The existing facilities are not energy efficient and would not be cost effective to make them efficient. The 193rd TEWGP is programmed to move into a new ANG Complex and return the inadequate facilities to the Commonwealth. This facility will expedite the move into the new ANG Complex.

IMPACT IF NOT PROVIDED: Continued operation of existing squadron operations will prolong an unsafe and inefficient operation.

[blocks in formation]

ANG COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

Harrisburg IAP, Middleton, PA
INSTALLATION/LOCATION

A. ESTIMATE COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR):

[blocks in formation]

($000) 280

« PreviousContinue »