Page images
PDF
EPUB
[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

DD1 DEC 76 1390s

[ocr errors]

UNTIL EXHAUSTED

784

20
1

NED

PAGE NO 4-45

[blocks in formation]

Construction: Masonry walls, steel structure, concrete floor with insulat ted built-up roof, heating/air conditioning, acoustical suspended ceiling. Area Includes: Reception, Administration, Commander, superintendant, supervisor offices, Men's & Women's Latrines, Locker rooms, Arms Vault, Storage, Control Center, Classroom and Mechanical.

AIR CONDITIONING: 10 tons

SUBSTANDARD: 1681 SF.

11. REQUIREMENT: 4187 SF. ADEQUATE : -0PROJECT: Provides an adequate security police operation facility for the 123rd Tactical Reconnaissance Wing.

REQUIREMENT: Weapon system and base security is essential to the training and performance of the unit's reconnaissance mission. This facility is necessary to provide the level and type of security required.

CURRENT SITUATION: Security police operations are conducted out of a total of 1681 SF in the Supply Warehouse, with Command and Administrative functions mingled. Due to severe space limitations, the Control Center cannot be isolated from other functions or from personnel traffic coming in to conduct routine business.

IMPACT IF NOT PROVIDED: The base security police function will continue to conduct operations and training in an inadequate facility.

[blocks in formation]

ANG COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

Standiford Field. Louisville, KY
INSTALLATION/LOCATION

A. ESTIMATE COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR):

[blocks in formation]

($000) 75

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY..

$29,000

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

0

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY..

N/A

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

N/A

[blocks in formation]

F. EQUIPMENT ASSICIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment

Procuring

Fiscal Year

Appropriated

4,300 21,500 21,500 0

4/83 (month and year)

Cost

None

/

[blocks in formation]

Four Unit Training Assemblies per month, 15 days Annual Field Training per year, daily use by Technician Force and for training.

6 OTHER ACTIVE GUARD RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

U.S. Naval Air Station; Military Sea Transportation Service; Naval Support Activity; Jackson Barracks (Hq, LA National Guard); Chief of Naval Reserve.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]
« PreviousContinue »