Page images
PDF
EPUB
[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.. $28,000

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY..

0

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

N/A

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

N/A

[blocks in formation]

F.

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

12/81

35

100

10/82

$ 16,400 4.100 20.500 0

4. CONSTRUCTION START.

EQUIPMENT ASSICIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

1/83 (month and year)

[blocks in formation]

90-276 0-82-94

[blocks in formation]

Four unit training assemblies per month, 15 days annual field training per year, daily use by technician force for training.

6 OTHER ACTIVE GUARD RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

Hickam AFB, Pearl Harbor Naval Base, Schofield Barracks (Army), Fort
Shafter (Army), Kaneohe Marine Corps Air Station, Barbers Point Naval
Air Station (all active military installations).

[blocks in formation]

DD1 DEC 76 1390s

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

NONE
Number of t

PAGE NO 4-27

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

10. DESCRIPTION OF PROPOSED CONSTRUCTION Concrete walls, brick or tilt up PCC walls, concrete floor and foundation, steel and gypsum plank roof. Teletype crypto/wire maintenance, quality control, training/testing, classrooms, ground radio maintenance radar simulator, unit supply, radar communications equipment rooms, radar operations, administration, toilet facilities, mechanical equipment and utilities.

AIR CONDITIONING: 125 tons

24,171 SF.

11. REQUIREMENT: 24,000 SF. ADEQUATE : -0-. SUBSTANDARD: PROJECT: Construction of a new AC&W operations facility. REQUIREMENT: A properly sized and configured facility is required to house the new Joint Surveillance System (JSS) and provide a Hawaii Region Operations Control Center. The JSS equipment replaces existing manual air defense tracking equipment with a sophisticated computerized system. It is necessary to support essential JSS systems maintenance, operations and supply activit ties. The JSS is scheduled for delivery to the Hawaii Air National Guard in May 1983. The present facility will be returned to the USAF to satisfy other facility requirements.

CURRENT SITUATION: Currently all major equipment is located in the Air Defense Direction and Control Centers with micorwave communications and radar terminals positioned in the adjacent room along with CEM maintenance and staff functions. The physical limitations of the existing facility will not permit direct installation of the JSS due to the increased space necessary plus added maintenance shop, supply, administrative support, UPS power, backup generators and air conditioning. There are no other existing facilities available that meet the space requirements.

IMPACT IF NOT PROVIDED: There will be no place to house the $12 million
ISS equipment package now being procured.

ANG COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

Wheeler AFB. Hawaii
INSTALLATION/LOCATION

($000)

A. ESTIMATE COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR):

0

[blocks in formation]
« PreviousContinue »