N&MCR COMPONENT A. DD Form 1390 Supplemental Data FY 1983 Military Construction, Naval Reserve Program Naval Air Facility, Washington, DC Chief of Naval Reserve Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981): Permanent Facilities COMMAND ($000) 700 (700) ( 0) 0 B. Similar Unused Space: C. Outstanding Pollution and Safety (OSHA) Deficiencies: THE EXISTING CONSOLIDATED AVIONICS SHOP WILL BE ENCLOSED WITH SOLID PARTITIONS AND AN ACOUSTIC SUSPENSION CEILING. AIR CONDITIONING WILL BE SUPPLIED TO THE AVIONICS SHOP FROM A ONE 30 TON, MULTI-ZONE ROOFTOP AIR CONDITIONING UNIT THROUGH DUCT SYSTEMS. THE UNIT WILL INCLUDE A STEAM HEATING COIL AND AN ECONOMIZER CYCLE. THE ECONOMIZER CYCLE UTILIZING OUTSIDE AIR, WILL PERMIT COOLING WITHOUT REFRIGERATION DURING MUCH OF THE YEAR. THE EXISTING FIRE PROTECTION SPRINKLER SYSTEM WILL REMAIN TO SERVE THE AREA ABOVE THE NEW CEILING, AND A NEW SPRINKLER SYSTEM WILL BE INSTALLED AT THE NEW CEILING HEIGHT. 11. REQUIREMENT: 6670 SF ADEQUATE O SF SUBSTANDARD 6670 SF PROJECT: PROVIDES ALTERATIONS TO THE EXISTING AVIONICS SPACE TO ENABLE PROPER CLIMATIC CONTROL. REQUIREMENT: PROVISIONS FOR CLIMATE CONTROL ARE REQUIRED THROUGHOUT THE AVIONICS SHOP TO PROTECT AND ENABLE PROPER OPERATION OF ELECTRONIC EQUIPMENT, PROVIDE A SAFE PERSONNEL ENVIRONMENT AND TO ENSURE THAT SATISFACTORY CALIBRATION ACCURACY IS ACHIEVED. CURRENT SITUATION: HIGH TEMPERATURE AND HUMIDITY DURING SUMMER MONTHS ENDANGERS ELECTRONIC COMPONENTS. THE PERFORMANCE ACCURACY OF CERTAIN ELECTRONIC INSTRUMENTS IS SERIOUSLY AFFECTED BY TEMPERATURE CHANGES AND CANNOT BE OPERATED DURING EXTREME TEMPERATURES. PERSPIRATION DECREASES TECHNICIANS SKIN RESISTANCE AND INCREASES HAZARD OF ELECTRICAL SHOCK. IMPACT IF NOT PROVIDED: MATERIAL READINESS THROUGH THE AVAILABILITY AND RELIABILITY OF AVIONICS EQUIPMENT WILL BE DOWNGRADED IN THE WARM SEASONS AND AVIONICS PERSONNEL WILL BE REQUIRED TO WORK ON HIGH VOLTAGE CIRCUITS UNDER POTENTIALLY HAZARDOUS CONDITIONS. AIR CONDITIONING WOULD IMPROVE THE RELIABILITY AND AVAILABILITY OF THIS EQUIPMENT AS WELL AS MINIMIZE À SAFETY HAZARD. ADDITIONAL: AN ECONOMIC ANALYSIS HAS NOT BEEN PREPARED AS THERE IS NO ALTERNATIVE TO MEET THE OPERATIONAL REQUIREMENT PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED FORM DD1 DEC 76 1391 PAGE NO 3-32 A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY... B. C. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 21.1 ($000) 0 700.9 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE N/A ($000) F. 4. CONSTRUCTION START. NOV 82 EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM |