DD Form 1390 Supplemental Data

FY 1983 Military Construction, Naval Reserve Program

Naval Air Facility, Washington, DC
INSTALLATION/LOCATION

Chief of Naval Reserve

Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

Permanent Facilities
Temporary Facilities

COMMAND

($000)

700 (700)

( 0)

0

B. Similar Unused Space:

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

THE EXISTING CONSOLIDATED AVIONICS SHOP WILL BE ENCLOSED WITH SOLID PARTITIONS AND AN ACOUSTIC SUSPENSION CEILING. AIR CONDITIONING WILL BE SUPPLIED TO THE AVIONICS SHOP FROM A ONE 30 TON, MULTI-ZONE ROOFTOP AIR CONDITIONING UNIT THROUGH DUCT SYSTEMS. THE UNIT WILL INCLUDE A STEAM HEATING COIL AND AN ECONOMIZER CYCLE. THE ECONOMIZER CYCLE UTILIZING OUTSIDE AIR, WILL PERMIT COOLING WITHOUT REFRIGERATION DURING MUCH OF THE YEAR. THE EXISTING FIRE PROTECTION SPRINKLER SYSTEM WILL REMAIN TO SERVE THE AREA ABOVE THE NEW CEILING, AND A NEW SPRINKLER SYSTEM WILL BE INSTALLED AT THE NEW CEILING HEIGHT.

11. REQUIREMENT: 6670 SF

ADEQUATE O SF SUBSTANDARD 6670 SF

PROJECT: PROVIDES ALTERATIONS TO THE EXISTING AVIONICS SPACE TO ENABLE PROPER CLIMATIC CONTROL.

REQUIREMENT: PROVISIONS FOR CLIMATE CONTROL ARE REQUIRED THROUGHOUT THE AVIONICS SHOP TO PROTECT AND ENABLE PROPER OPERATION OF ELECTRONIC EQUIPMENT, PROVIDE A SAFE PERSONNEL ENVIRONMENT AND TO ENSURE THAT SATISFACTORY CALIBRATION ACCURACY IS ACHIEVED.

CURRENT SITUATION: HIGH TEMPERATURE AND HUMIDITY DURING SUMMER MONTHS ENDANGERS ELECTRONIC COMPONENTS. THE PERFORMANCE ACCURACY OF CERTAIN ELECTRONIC INSTRUMENTS IS SERIOUSLY AFFECTED BY TEMPERATURE CHANGES AND CANNOT BE OPERATED DURING EXTREME TEMPERATURES. PERSPIRATION DECREASES TECHNICIANS SKIN RESISTANCE AND INCREASES HAZARD OF ELECTRICAL SHOCK.

IMPACT IF NOT PROVIDED: MATERIAL READINESS THROUGH THE AVAILABILITY AND RELIABILITY OF AVIONICS EQUIPMENT WILL BE DOWNGRADED IN THE WARM SEASONS AND AVIONICS PERSONNEL WILL BE REQUIRED TO WORK ON HIGH VOLTAGE CIRCUITS UNDER POTENTIALLY HAZARDOUS CONDITIONS. AIR CONDITIONING WOULD IMPROVE THE RELIABILITY AND AVAILABILITY OF THIS EQUIPMENT AS WELL AS MINIMIZE À SAFETY HAZARD.

ADDITIONAL: AN ECONOMIC ANALYSIS HAS NOT BEEN PREPARED AS THERE IS NO ALTERNATIVE TO MEET THE OPERATIONAL REQUIREMENT PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED

FORM

DD1 DEC 76

1391

PAGE NO 3-32

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY...

B.

C.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

21.1

($000)

0
(PEOPLE)

700.9 ($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

N/A ($000)

[blocks in formation]

F.

4. CONSTRUCTION START.

NOV 82
(month & yr)

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM

[blocks in formation]
[blocks in formation]

Normal work week plus drills three weekends per month and two weeks of annual active duty for training for attached units

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS

[blocks in formation]

DD, MAY 78 1390s

PAGE NO

3-33

[blocks in formation]

DD.

FORM

1 DEC 76

1391c

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

3-34

PAGE NO

« PreviousContinue »