DD Form 1390 Supplemental Data

FY 1983 Military Construction, Naval Reserve Program

NAVAL AND MARINE CORPS RESERVE CENTER

COLUMBIA, SC (AT FORT JACKSON)
INSTALLATION/LOCATION

Estimated Cost of Backlog of Real Property Maintenance
(BMAR) (as of September 30, 1981)

[blocks in formation]

CMC COMMAND

($000)

0

0

[blocks in formation]

REINFORCED HOLLOW MASONRY WALL (LOAD BEARING), CONTINUOUS REINFORCED CONCRETE FOOTING AND SLAB, BUILT UP ROOFING OVER RIGID INSULATION; STEEL OVERHEAD DOORS, NORMAL PLUMBING; ELECTRIC POWER FOR LIGHTS AND EQUIPMENT OPERATION; ONE TYPE I, CLASS B HYDRAULIC POWER LIFT; OVERHEAD CRANE, 6 TON; HEATING: REQUIRED VENTILATION; AIR COMPRESSOR WITH REQUIRED AIR HOSES. INCLUDES TOTAL REQUIREMENT FOR VEHICLE MAINTENANCE SUPPORT.

11. PROJECT: PROJECT PROVIDES A TYPE "C" VEHICLE MAINTENANCE FACILITY
CONSISTING OF ONE AUTOMOTIVE BAY 16'X30' (480SF); TWO HEAVY EQUIPMENT BAYS
16'x40' (640 SF EACH); 500 SF OF GENERAL SPACE TO SUPPORT AN OFFICE, BATTERY
ROOM, TOOL STORAGE ROOM; AND TOILET; 64 SF OF FLAMMABLE STORAGE.
REQUIREMENT: AN ADEQUATE VEHICLE MAINTENANCE FACILITY IS REQUIRED TO KEEP
VEHICULAR EQUIPMENT ASSIGNED IN OPERATION TO SUPPORT UNIT TRAINING AND
MAINTAIN A HIGH DEGREE OF MOBILIZATION READINESS.

CURRENT SITUATION: THE MARINE CORPS RESERVE HAS 23 ITEMS OF TRACKED AND
WHEELED VEHICULAR EQUIPMENT ASSIGNED TO SUPPORT UNIT TRAINING AND MOBILIZA-
TION REQUIREMENTS. VEHICLE MAINTENANCE IS PERFORMED IN A MAKESHIFT FACILITY
WITHOUT THE BENEFIT OF REQUIRED POWER LIFTS AND OVERHEAD CRANE.
MUCH OF THE MAINTENANCE WORK MUST BE PERFORMED OUTDOORS. DURING PERIODS OF
INCLEMENT WEATHER SCHEDULED MAINTENANCE MUST BE DEFERRED, RESULTING IN
EXTENDING THE DEADLINE TIME FOR EQUIPMENT REQUIRED TO SUPPORT TRAINING.
IMPACT IF NOT PROVIDED: EQUIPMENT MAINTENANCE WILL CONTINUE TO BE PERFORMED
IN AN INADEQUATE, ANTIQUATED, AND UNSAFE FACILITY THAT PREVENTS THE MOST
EFFECTIVE USE OF BOTH MANPOWER AND EQUIPMENT AND COULD ADVERSELY AFFECT THE
TRAINING AND MOBILIZATION READINESS OF THE MARINE CORPS RESERVE UNIT.
ADDITIONAL: AN ECONOMIC ANALYSIS HAS NOT BEEN PREPARED AS THERE IS NO
ALTERNATIVE TO MEET THIS OPERATIONAL REQUIREMENT. AFTER CONSTRUCTION
EXISTING SHED WILL BE DEMOLISHED BY MARINE CORPS IN TRAINING EXERCISE.

[blocks in formation]
[blocks in formation]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.....

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

0
(PEOPLE)

394.0

($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.....

595.0 ($000)

[blocks in formation]

F.

[blocks in formation]

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM
OTHER APPROPRIATIONS:

[blocks in formation]
[blocks in formation]

NORMAL WORK WEEK PLUS DRILLS THREE WEEKENDS PER MONTH AND TWO WEEKS OF
ANNUAL ACTIVE DUTY FOR TRAINING FOR ATTACHED UNITS

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS NAVY

1

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

DD MAY 18
FORM 1390S

[blocks in formation]
[blocks in formation]

90-276 0-82-88

3-18

« PreviousContinue »