FY 19 83GUARD AND RESERVE
N&MCR

MILITARY CONSTRUCTION
18.TALLATION AND LOCATION"
NAVAL AND MARINE CORPS RESERVE CENTER
ORLANDO, FLORIDA
FRIGULNCY AND TYPE OF UTILIZATION

0.93

NORMAL WORK WEEK PLUS DRILLS TWO WEEKENDS PER MONTH

6. OTHEA ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

RECRUIT TRAINING COMMAND, REGIONAL MEDICAL CENTER, SERVICE SCHOOL COMMAND, TRAINING EQUIPMENT CENTER, TRAINING CENTER, 4 ARMY RESERVE CENTERS, AND I ARMY NATIONAL GUARD.

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[ocr errors]

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

2. DATE

1 JAN 82

1. COMPONENT

FY 1983 GUARD AND RESERVE

MILITARY CONSTRUCTION N&MCR 3 INSTALLATION AND LOCATION NAVAL AND MARINE CORPS RESERVE CENTER ÞRLANDO, FLORIDA 11 PERSONNEL STRENGTH AS OF

30 SEP 1981

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

DD Form 1390 Supplemental Data
FY 1983 Military Construction, Naval Reserve Program

N&MCR COMPONENT

NAVAL AND MARINE CORPS RESERVE CENTER

ORLANDO, FLORDIA
INSTALLATION/LOCATION

Chief of Naval Reserve

COMMAND

($000)

A.

Estimated cost of Backlog of Real Property Maintenance
(BMAR) (as of September 30, 1981)

Permanent Facilities
Temporary Facilities

[merged small][ocr errors]
[blocks in formation]

c. Outstanding Pollution and Safety (OSHA) Deficiencies:

[merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small]

1. COMPONENT

2. DATE N&MCR FY 19.83 MILITARY CONSTRUCTION PROJECT DATA

1 JAN 82 3. INSTALLATION AND LOCATION

4. PROJECT TITLE NAVAL AND MARINE CORPS RESERVE CENTER

RESERVE TRAINING BUILDING ORLANDO, FLORIDA

ADDITION

[blocks in formation]

BUILDING ADDITION CONSTRUCTED OF CONCRETE BLOCK W/BRICK VENEER ON EXTERIOR
WALLS AND BAR JOISTS WITH A BUILT-UP ROOF OVER A PREFORMED ROOF DECK; CON
CRETE SLAB FLOOR ON GRADE WITH TERRAZO TOPPING. TOTAL AREA INCLUDES TOI-
LETS, UNIT ADMINISTRATION, CONFERENCE ROOM, STORAGE, AND CLASSROOMS; 30 TON
AIR CONDITIONING REQUIREMENT.
11. REQUIREMENT: 30,895 SF ADEQUATE: 17,246 SF SUB-STANDARD: 0 SF
PROJECT: CONSTRUCT BUILDING ADDITION TO PROVIDE THE REQUIRED SPACES IN
TRAINING NAVAL RESERVISTS.
REQUIREMENT: THE SIGNIFICANT INCREASE IN THE NUMBER OF DRILLING UNITS AND
RESERVISTS ASSIGNED AS WELL AS DESIGNATION OF RESERVE CENTER AS A CENTRAL
DRILL SITE WITH A PROMINENT PORTION BEING CONVERTED TO SHIPBOARD SIMULATOR
AND DAMAGE CONTROL TRAINER, HAS CREATED A CRITICAL SHORTAGE OF SPACE FOR
TRAINING. ADDITION WILL PROVIDE FOR MULTI-MEDIA TRAINING, UNIT ADMINISTRA-
TION, CONFERENCE ROOM, AND STORAGE WHICH ARE PRESENTLY NON-EXISTENT, AND
CLASSROOMS AND TOILETS TO AUGMENT PRESENTLY INADEQUATE FACILITIES.
CURRENT SITUATION: SPACES PREVIOUSLY USED AS CLASSROOMS AND ADMINISTRATIVE
SPACES ARE BEING MODIFIED FOR THE INSTALLATION OF THE SHIPBOARD SIMULATOR,
WITH EQUIPMENT INSTALLED IN LATE 1981. THE AREA DESIGNATED FOR DAMAGE Cat
TROL TRAINING SCHEDULED FOR COMPLETION IN EARLY FY 1982 IS PRESENTLY BEING
USED AS A STORAGE AREA WHILE THE SHOPS OFTEN USED AS CLASSROOMS.
IMPACT IF NOT PROVIDED: WITH SHIPBOARD SIMULATOR AND DAMAGE CONTROL TRAINER
PLACED IN OPERATION, THE AVAILABLE SPACE FOR TRAINING AND UNIT ADMINISTRA
TION FOR THE 500 NAVAL RESERVISTS IN 15 UNITS HAS BEEN LOST. SHIPBOARD SIM
ULATOR TRAINING IS THE ONLY VIABLE TRAINING AVAILABLE. RECRUITING WILL HAVE
TO BE CURTAILED IN THE ORLANDO AREA DUE TO THE LACK OF TRAINING FACILITIES.
ADDITIONAL: AN ECONOMIC ANALYSIS HAS NOT BEEN PREPARED AS THERE IS NO
ALTERNATIVE TO MEET THIS OPERATIONAL REQUIREMENT.
DD,

PAGE NO. 3-3
U.S. GOVERNMENT PRINTING OFFICE 1979-603-076/3959 2-1.

FORM

1 DEC 78 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

WN 0129-U901-3010

1. COMPONENT

2. DATE FY 19 83 MILITARY CONSTRUCTION PROJECT DATA N&MCR

1 JAN 82 3. INSTALLATION AND LOCATION NAVAL AND MARINE CORPS RESERVE CENTER, ORLANDO, FLORIDA 4. PROJECT TITLE

5. PROJECT NUMBER

RESERVE TRAINING BUILDING ADDN.

P-307

SUPPLEMENTAL DATA

A.

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY...

($000)

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY.

[blocks in formation]

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.

89 (5000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...... N/A

($000)
DESIGN DATA (Estimated)

E.

[blocks in formation]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM
OTHER APPROPRIATIONS:

Fiscal Year
Equipment
Procuring
Appropriated

Cost
Nomenclature
Appropriation

Or Requested ($000)

[blocks in formation]