6 OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS 8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION Facilities identified in item 6 have been examined by the State ove Forces Facilities Board for possible joint use/expansion. The Board recommenation is unilateral construction. LAND ACQUISITION REQUIRED NONE 10. PROJECTS PLANNED IN NEXT FOUR YEARS None 12 Feb 81 (Date) (Number of Acres) DD FORM 1390s Page 1 of 2 PAGE NO 2-39 90-276 0-82--84 A. USAR COMPONENT DD FORM 1390 SUPPLEMENTAL DATA FY 1983 MILITARY CONSTRUCTION PROGRAM USARC, Kittanning, PA INSTALLATION/LOCATION FORSCOM ESTIMATED COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR): 10. DESCRIPTION OF PROPOSED CONSTRUCTION Construct a one story training building and Organizational Maintenance Shop (OMS) of permanent type construction, i.e., brick and concrete block, concrete floors and built-up roofing. The training center will include the following functional areas: administrative library/classrooms, assembly hall, training aid storage, locker areas, unit storage, arms vault, food storage/preparation and scullery, toilet/showers, retention and mechanical equipment room. The OMS will include the following functional areas: 2 work bays, office, parts/supply storage, flammable storage, battery room and toilet areas. Construction will also include all supporting facilities such as: utilities, paved parking areas, exterior lighting, fencing, sidewalks and access road. Air Conditioning: None. 14,048 SF ADEQUATE : 11. REQUIREMENT: 0 SUBSTANDARD: 6350 SF (leased) PROJECT: Construction of a 100-member USARC with 2 bay maintenance shop. REQUIREMENT: This project is required to provide a standard design, government owned facility to house the 332 Engr Co (Dump Truck) and a power plant operation/maintenance team. CURRENT SITUATION: The units are presently housed in a leased former bowling alley. This building is not property configured for maximum performance of the units' training mission. IMPACT IF NOT PROVIDED: The existing unsatisfactory facilities will continue in use with a continuing detrimental impact on the units' capability to attain and maintain individual and unit training and A Estimated annual cost to operate the proposed facility.......... B. Number of additional personnel necessary to carry out the function of the proposed facility.. C. Estimated life-cycle cost to operate and maintain the proposed facility... D. Estimated life-cycle cost to operate and maintain the existing facility if new facility is a replacement.. 12 ($000) 0 (People) 300 ($000) 593 ($000) 4. Construction start (month and year) December 1982 F. Equipment associated with this project which will be provided from other appropriations: |