Page images
PDF
EPUB

DD FORM 1390 SUPPLEMENTAL DATA
FY 1983 MILITARY CONSTRUCTION PROGRAM

USAR
COMPONENT

USARC, Stillwater, OK

INSTALLATION/LOCATION

FORSCOM
COMMAND

A.

5

ESTIMATED COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR):

Semi-permanent Facilities:
Permanent Facilities
Temporary Facilities

:

:

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]

1

COMPONENT

2. DATE
FY 19.83 MILITARY CONSTRUCTION PROJECT DATA 1 Jan 82
USAR
INSTALLATION AND LOCATION

PROJECT TITLE

Modernization/Addition for 150USAR Center, Stillwater, OK

Mbr USARC

3

4

[blocks in formation]

'0. DESCRIPTION OF PROPOSED CONST?UCTION Addition to and modernization of Reserve Center to increase rated capacity

to 150-members. Existing organizational maintenance shop will be converted to unit and flammable storage and locker area. Addition will have concrete foundation and floor, masonry walls and asphaltic built-up roof and rigid insulation on metal deck. Air Conditionining: 20 tons. 11.

REQUIREMENT: 16,992 SF ADEQUATE: 0 SF SUBSTANDARD: 14,124 SF PROJECT: Addition to and modernization of Reserve Center. REQUIREMENT: This facility is required to house the HHD, 3d Brigade and the HHD and five lettered Cos of the ist Bn, 291st Regt. This center will provide the necessary administrative, indoor training areas and storage of equipment space for the units to achieve needed proficiency in required training and to accomplish assigned readiness objectives. CURRENT SITUATION: The present facilit which was erected in 1959 consists of an 11,568 SF one-story training building and a 2,556 SF maintenance shop The center is deficient in administrative, mess, latrine, learning center and privately owned vehicle parking space. The arms vault is inadequate. The units have no vehicles and no requirement for a maintenance shop. IMPACT IF NOT PROVIDED: The overcrowded conditions, inadequate secure storage and training areas will have adverse effects on morale of personnel and future recruiting and retention efforts.

[ocr errors][subsumed][merged small][merged small][merged small][merged small]

1. COMPONENT

2. DATE FY 19 83 MILITARY CONSTRUCTION PROJECT DATA USAR

1 Jan 82 3. INSTALLATION AND LOCATION

[blocks in formation]

Number of additional personnel necessary to carry out
the function of the proposed facility..

0 (People)

[ocr errors]

Estimated life-cycle cost to operate and maintain the
proposed facility.....

N/A (5000)

D.

Estimated life-cycle cost to operate and maintain the
existing facility if new facility is a replacement.

N/A (5000)

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

F.

Equipment associated with this project which will be provided
from other appropriations:

Fiscal Year
Equipment
Procuring

Appropriated
Nomenclature
Appropriation

Or Requested
Kitchen Equipment

OMAR

83

Cost ($000)

49

NOAM

VIVICustomTORS MAY BE USED INTEANALY

2. DATE

1. COMPONENT

FY 19_83GUARD AND RESERVE USAR

MILITARY CONSTRUCTION "ISTALLATION AND LOCATION

1 Jan 82

4. AREA CONSTR COST INDEX

1.01

USAR Center, Kittanning, PA

5. FREQUENCY AND TYPE UTILIZATION

stekends per month by Reservists. five days per week by Technicians.

6 OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS

[blocks in formation]

8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION

12 Feb 81 Facilities identified in item 6 have been examined by the State

(Datel ...ve Forces Facilities Board for possible joint use/expansion. llic Board recommenation is unilateral construction. LAND ACQUISITION REQUIRED NONE

(Number of Acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

DD, FOAM

1390s

PREVIOUS EDITIONS MAY BE USED INTEANALLY

PAGE NO2-65

UNTIL EXHAUSTED

1 DEC 74

« PreviousContinue »