Page images
PDF
EPUB
[blocks in formation]

A. Estimated annual cost to operate the proposed facility..........

B.

Number of additional personnel necessary to carry out the function of the proposed facility..

C. Estimated life-cycle cost to operate and maintain the proposed facility....

D. Estimated life-cycle cost to operate and maintain the existing facility if new facility is a replacement..

[blocks in formation]

21

($000)

0

(People)

318 ($000)

N/A ($000)

F.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

4. Construction start (month and year)__ February 1983

Equipment associated with this project which will be provided
from other appropriations:

[blocks in formation]

1. COMPONENT

USAR

3 INSTALLATION AND LOCATION

USAR Center, Dublin, GA

FY 1983 GUARD AND RESERVE
MILITARY CONSTRUCTION

5 FREQUENCY AND TYPE UTILIZATION

5 days per week by civilian technicians and recruiters

night per week by Reserve personnel

2. DATE
1 Jan 82

4. AREA CONSTR COST INDEX

0.86

5 days per week by Reserve personnel to support year round mission operation 16 hours per month by USAR School

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS

[blocks in formation]

8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION

Facilities identified in item 6 have been examined by the State
Rerve Forces Facilities Board for possible joint use/expansion.
The Board recommendation is unilateral construction.

LAND ACQUISITION REQUIRED

None

10. PROJECTS PLANNE IN NEXT FOUR YEARS

None

2 Apr 81 (Date)

(Number of Acres)

[blocks in formation]

90-276 0-82-81

205

203

AUTHORIZED

ECS

17

17

67

9

[ocr errors]

ASSIGNED 10 12

40

4

110

40

66

TIT

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO. 2-9

A.

USAR
COMPONENT

DD FORM 1390 SUPPLEMENTAL DATA

FY 1983 MILITARY CONSTRUCTION PROGRAM

USARC, Dublin, GA

INSTALLATION/LOCATION

FORSCOM
COMMAND

ESTIMATED COST OF BACKLOG OF REAL PROPERTY MAINTENANCE (BMAR):

[blocks in formation]
[blocks in formation]

10 DESCRIPTION OF PROPOSED CONSTRUCTION,

A specially designed training building of permanent masonry type construction with built-up roof and concrete and tile floors and a two-bay maintenance shop with attached unit storage, both of masonry construction. Air Conditioning: 25 tons.

11. REQUIREMENT: 20,327 SF ADEQUATE: 0 SUBSTANDARD: 13,500 SF PROJECT: Construction of 300-Member USARC with a 2-bay Organizational Maintenance Shop.

REQUIREMENT: A new facility is requested to replace a totally inadequate and extremely overcrowded leased facility. This building will provide all the functional areas necessary to support the mission of the 988th Repair Parts Co consisting of 255 personnel and improve their combat readiness. CURRENT SITUATION: The 988th Supply Co presently occupies a leased facility having approximately 11,000 SF in one building and 2,500 SF in an adjoining building. A separate lease is also required to provide POV parking. This 60-Member rated facility with a utilization factor of 342% does not have a mess capability, nor a rifle range, and is not constructed to support the requirements of the Repair Parts Company. Both leases will be cancelled upon construction of the new center. In 1978, Laurens County permitted 5.61 acres for the construction of a new USARC.

IMPACT IF NOT PROVIDED: Unit assigned will remain in the inadequate, overcrowded and poorly maintained leased facility. These conditions will have an adverse effect on troop morale, will therefore affect the retention and recruiting program, and will not provide the conditions required to enhance mission performance.

DD1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO 2-10

« PreviousContinue »