Page images
PDF
EPUB

COMPONENT

2 DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA ARNG

1 JAN 1982 INSTALUTTON AND LOCATION

MCGHEE - TYSON ANG BASE, KNOXVILLE, TENNESSEE
VHODNE

BRUNCT NUMBER

ARMY AVIATION SUPPORT FACILITY

470

SUPPLEMENTAL DATA

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

16

(5000) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY.....

N/A

(PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE PROPOSED FACILITY.....

N/A

(5000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.......

N/A

75000) DESIGN DATA (Estimated)

E.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small]

9/83 Tmonth and yeur)

[ocr errors]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost
($000)

Telephone Equipment
JSIIDS

BP 3737
BP 3733

83 83

8 15

18

2. DATE

1. COMPONENT

FY 1983 GUARD AND RESERVE ARNG

MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION

1 JAN 1982

4. AREA CONSTA

COST INDEX

ST THOMAS, US VIRGIN ISLANDS 5. FREQUENCY AND TYPE OF UTILIZATION

NORMAL ADMINISTRATION FIVE DAYS PER WEEK WITH TWO 2-DAY TRAINING
ASSEMBLIES PER MONTH

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

[blocks in formation]

NO OTHER RESERVE COMPONENTS ARE ESTABLISHED IN THE VIRGIN
ISLANDS SO THERE IS NO REQUIREMENT FOR A BOARD

N/A
(Dare)

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

"A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED."

DD..

FORM

DEC 1390s

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

AGE NO 1-124

[blocks in formation]

PAGE NO 1-125

COMPONENT

2 DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA ARNG

1 JAN 1982 INSTALLATION AND LOCATION

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]
[blocks in formation]

A.

Estimated cost of Backlog of Real Property Ma intera nce
(BMAR) (as of September 30, 1981):

Permanent Facilities
Temporary Facilities

[ocr errors]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]
« PreviousContinue »