A specially designed facility of permanent masonry type construction, 11. REQUIREMENT: 15,649 SF ADEQUATE : 0 SUBSTANDARD: 2,400 SF PROJECT: A new armory facility is required to serve the peacetime mission of the unit, which will permit the unit to perform their various military skills. REQUIREMENT: The armory is required to house Detachment 1, Howitzer Battery, 1st Squadron, 163d Armored Cavalry, Montana Army National Guard, and will provide the necessary functional areas required for training personnel to achieve proficiency for a wartime mission. The armory will be sited on a 5+ acre, State-owned site. CURRENT SITUATION: The unit presently occupies an old cinder block Motor Vehicle Storage Building, constructed in the early 50's, containing approximately 2,400 square feet. It lacks all functional areas expected of an armory, and is not energy, security, or safety sound. The present building will be leased by the State of Montana. IMPACT IF NOT PROVIDED: The unit would, out of necessity, continue using the present storage building which lacks all functional areas, as well as being totally unsound: energy, security, and safety wise. Mobilization readiness would be greatly affected. DD, FORM DEC 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO 1-69 A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.... B. C. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) 1. STATUS 0 ($000) 0 ($000) 75000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE 6/83 (month and year) Cost ($000) 10 DD1391c PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO 1-69b NORMAL ADMINISTRATION FIVE DAYS PER WEEK WITH AVERAGE THREE 2-DAY TRAINING ASSEMBLIES PER MONTH 6 OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS FORT HARRISON ARMORY (SAME LOCATION) 1920's (6 MILES) (1 MILE 15 MAY 81 FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE (Date) 0 (Number of Acres) NONE 10. PROJECTS PLANNED IN NEXT FOUR YEARS NONE "A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED." |