2. DATE

COMPONENT

FY 1983 GUARD AND RESERVE ARNG

MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION

1 JAN 1982

4. AREA CONSTA

COST INDEX
.95

HARLOWTON, MONTANA 5. FREQUENCY AND TYPE OF UTILIZATION

NORMAL ADMINISTRATION FIVE DAYS PER WEEK WITH A TWO-DAY TRAINING ASSEMBLY PER MONTH

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

[blocks in formation]

8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION

15 MAY 1981 FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED

0 NONE

(Number of tires 10. PriOJECTS PLANNED IN NEXT FOUR YEARS

NONE

"A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED."

[merged small][merged small][ocr errors]

1 DEC * 13903

EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO 1-67

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][subsumed][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

DD Form 1390 Supplemental Data
FY 1983 Military Construction Program

ARNG COMPONENT

HARLOWTON/MONTANA
INSTALLATION/LOCATION

MTARNG
COMMAND

($000)

A. Estimated Cost of Backlog of Real Property Maintenance
(BMAR) (as of September 30, 1981):

Permanent Facilities
Temporary Facilities

[ocr errors]

B. Similar Unused Space:

Real Property Categories

Quantity/Unit of

Mes sure

NONE

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

2 DATE

COMPONENT

FY 19_83 MILITARY CONSTRUCTION PROJECT DATA ARNG 3. INSTALLATION AND LOCATION

4. PROJECT TITLE

1 JAN 1982

[blocks in formation]

10. DESCRIPTION OF PROPOSED CONSTRUCTION A specially designed facility of permanent masonry type construction, brick and/or concrete block units, with built-up roof and concrete floors. One-story structure with necessary mechanical and electrical equipment. Air Conditioning - None 11. REQUIREMENT: 15,649 SF ADEQUATE: 0 SUBSTANDARD: 2,400 SF PROJECT: A new armory facility is required to serve the peacetime mission of the unit, which will permit the unit to perform their various military skills. REQUIREMENT: The armory is required to house Detachment 1, Howitzer Battery, 1st Squadron, 163d Armored Cavalry, Montana Army National Guard, and will provide the necessary functional areas required for training personnel to achieve proficiency for a wartime mission. The armory will be sited on a 5+ acre, State-owned site. CURRENT SITUATION: The unit presently occupies an old cinder block Motor Vehicle Storage Building, constructed in the early 50's, containing approximately 2,400 square feet. It lacks all functional areas expected of an armory, and is not energy, security, or safety sound. The present building will be leased by the State of Montana. IMPACT IF NOT PROVIDED: The unit would, out of necessity, continue using the present storage building which lacks all functional areas, as well as being totally unsound: energy, security, and safety wise. Mobilization readiness would be greatly affected.

DD 1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED
Na-

ne 72

PAGE NO 1-69

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY....

0 (PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

0 (5000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT

0 (5000)

[blocks in formation]

6/83 Tmonth and year)

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS :

Fiscal Year
Equipment

Procuring

Appropriated
Nomenclature
Appropriation

Or Requested

Cost ($ 000)

Kitchen Equipment

BP 3733

83

10

[ocr errors]