ARNG COMPONENT

DD Form 1390 Supplemental Data
FY 1983 Military Construction Program

CAMP GRAYLING/MICHIGAN
INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

B. Similar Unused Space:

Real Property Categories

Permanent Facilities
Temporary Facilities

NONE

MIARNG

COMMAND

Quantity/Unit of
Measure

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

[blocks in formation]
[merged small][merged small][merged small][ocr errors]
[blocks in formation]

Is a specially designed facility, with cold storage, of permanent masonry construction, concrete block units, with built-up roof and concrete floors. A one-story building with mechanical and electrical equipment.

Air Conditioning

[ocr errors][merged small]

11. REQUIREMENT: 110,114 SF ADEQUATE : 0

SUBSTANDARD: 156,727 SF

PROJECT: A new facility is requested to meet the logistical requirements of units using the annual training site. The space will permit all troop support logistical functions to be conducted in one location. REQUIREMENT: This facility is required to receive, store, and issue supplies and food to troop units and provide space for logistical operations in the support of the annual training site. The requirement is for 110,114 SF of new construction to accomplish the mission. CURRENT SITUATION: The present facilities consist of 20 separate structures spread throughout the training site, which contain 156,727 SF of covered space. The age, condition and location of these buildings precludes their modification to collect all functions in one area.

IMPACT IF NOT PROVIDED: Logistical functions will be required to operate in dispersed, unserviceable buildings which are beyond design life and economic repair criteria at the incalculable cost of operational efficiency.

DD1 DEC 76

FORM

1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO 1-58

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY...

50

($000)

0

(PEOPLE)

C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.....

2,517 ($000)

D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.....

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

N/A

($000)

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

4. CONSTRUCTION START...

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment Nomenclature

Procuring
Appropriation

NONE

Fiscal Year
Appropriated
Or Requested

4/83 Tmonth and year)

Cost
($000)

[blocks in formation]
[blocks in formation]

1-58b

[blocks in formation]

NORMAL ADMINISTRATION FIVE DAYS PER WEEK AND A MINIMUM OF TWO-DAYS PER
MONTH FOR TRAINING ASSEMBLIES

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

ARNG: GRAND HAVEN (28 MILES)

100-PERSON ARMORY

[blocks in formation]
[blocks in formation]
[blocks in formation]

30 SEP 1981

FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE

STATE RESERVE FORCES FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION.
THE BOARD RECOMMENDATIONS ARE UNILATERAL CONSTRUCTION.

[blocks in formation]

"A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION

OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED."

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]