ARNG COMPONENT DD Form 1390 Supplemental Data CAMP GRAYLING/MICHIGAN A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981): B. Similar Unused Space: Real Property Categories Permanent Facilities NONE MIARNG COMMAND Quantity/Unit of C. Outstanding Pollution and Safety (OSHA) Deficiencies: Is a specially designed facility, with cold storage, of permanent masonry construction, concrete block units, with built-up roof and concrete floors. A one-story building with mechanical and electrical equipment. Air Conditioning 11. REQUIREMENT: 110,114 SF ADEQUATE : 0 SUBSTANDARD: 156,727 SF PROJECT: A new facility is requested to meet the logistical requirements of units using the annual training site. The space will permit all troop support logistical functions to be conducted in one location. REQUIREMENT: This facility is required to receive, store, and issue supplies and food to troop units and provide space for logistical operations in the support of the annual training site. The requirement is for 110,114 SF of new construction to accomplish the mission. CURRENT SITUATION: The present facilities consist of 20 separate structures spread throughout the training site, which contain 156,727 SF of covered space. The age, condition and location of these buildings precludes their modification to collect all functions in one area. IMPACT IF NOT PROVIDED: Logistical functions will be required to operate in dispersed, unserviceable buildings which are beyond design life and economic repair criteria at the incalculable cost of operational efficiency. DD1 DEC 76 FORM 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO 1-58 A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.... B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT 50 ($000) 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 2,517 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE N/A ($000) 4. CONSTRUCTION START... F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring NONE Fiscal Year 4/83 Tmonth and year) Cost 1-58b NORMAL ADMINISTRATION FIVE DAYS PER WEEK AND A MINIMUM OF TWO-DAYS PER 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS ARNG: GRAND HAVEN (28 MILES) 100-PERSON ARMORY 30 SEP 1981 FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. "A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED." |