Consists of a three bay maintenance facility including administrative areas, and outside supporting items.

roof and concrete floor.

Air Conditioning 1 ton
11. REQUIREMENT: 4,071 SF

Construction to be masonry, built-up

ADEQUATE :

0 SUBSTANDARD: 2,880 SF PROJECT: This new maintenance shop will provide an adequate facility to support the maintenance needs of the 3rd Battalion 156th Infantry (Mech). REQUIREMENT: This facility is required to provide the organizational level of maintenance to all units of this battalion.

CURRENT SITUATION: The existing building used as an Organizational Maintenance Shop is a Motor Vehicle Storage Building constructed in 1953 with 2,880 square feet. The building lacks adequate office and supply space as well as battery rooms and equipment custodial space. The existing space used as maintenance bays lacks air, water, and electrical outlets suff1cient to support maintenance.

IMPACT IF NOT PROVIDED: Failure to provide this facility would be detrimental in that the maintenance of equipment needed for training would continue to be performed in an inadequate method.

DDD1391

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO

1-51

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

4

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY...

(PEOPLE)

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY....

262

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT...

0

($000

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Equipment Nomenclature

Procuring
Appropriation

Fiscal Year
Appropriated
Or Requested

(month and year)

Cost ($000)

NONE

PREVIOUS COLTON, NAY BE USED INTERNALLY
UNTIL EEMAUSTED

[blocks in formation]

DAILY FOR STORAGE AND MAINTENANCE OF EQUIPMENT OVER 40 WEEKENDS PER YEAR FOR ISSUE AND RECEIPT OF EQUIPMENT TO USING UNITS.

FALMOUTH

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS ARNG:

(15 MILES) 200-PERSON ARMORY

[blocks in formation]
[blocks in formation]

(Date)

FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE
STATE RESERVE FORCES FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION.
THE BOARD RECOMMENDATIONS ARE UNILATERAL CONSTRUCTION.
9. LAND ACQUISITION REQUIRED
NONE

10. PROJECTS PLANNED IN NEXT FOUR YEARS

NONE

(Number of Acres)

"A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION

OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED."

[blocks in formation]

90-276 0-82--71

[blocks in formation]

1-52

[blocks in formation]

ARNG COMPONENT

DD Form 1390 Supplemental Data
FY 1983 Military Construction Program

CAMP EDWARDS/MASSACHUSETTS

INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

B. Similar Unused Space:

Real Property Categories

Permanent Facilities
Temporary Facilities

NONE

[merged small][merged small][merged small][merged small][merged small][ocr errors]

Quantity/Unit of
Measure

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

[blocks in formation]