Consists of a three bay maintenance facility including administrative areas, and outside supporting items. roof and concrete floor. Air Conditioning 1 ton Construction to be masonry, built-up ADEQUATE : 0 SUBSTANDARD: 2,880 SF PROJECT: This new maintenance shop will provide an adequate facility to support the maintenance needs of the 3rd Battalion 156th Infantry (Mech). REQUIREMENT: This facility is required to provide the organizational level of maintenance to all units of this battalion. CURRENT SITUATION: The existing building used as an Organizational Maintenance Shop is a Motor Vehicle Storage Building constructed in 1953 with 2,880 square feet. The building lacks adequate office and supply space as well as battery rooms and equipment custodial space. The existing space used as maintenance bays lacks air, water, and electrical outlets suff1cient to support maintenance. IMPACT IF NOT PROVIDED: Failure to provide this facility would be detrimental in that the maintenance of equipment needed for training would continue to be performed in an inadequate method. DDD1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO 1-51 A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.... 4 B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 262 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 0 ($000 F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring Fiscal Year (month and year) Cost ($000) NONE PREVIOUS COLTON, NAY BE USED INTERNALLY DAILY FOR STORAGE AND MAINTENANCE OF EQUIPMENT OVER 40 WEEKENDS PER YEAR FOR ISSUE AND RECEIPT OF EQUIPMENT TO USING UNITS. FALMOUTH 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS ARNG: (15 MILES) 200-PERSON ARMORY (Date) FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE 10. PROJECTS PLANNED IN NEXT FOUR YEARS NONE (Number of Acres) "A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED." 90-276 0-82--71 1-52 ARNG COMPONENT DD Form 1390 Supplemental Data CAMP EDWARDS/MASSACHUSETTS INSTALLATION/LOCATION A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981): B. Similar Unused Space: Real Property Categories Permanent Facilities NONE Quantity/Unit of C. Outstanding Pollution and Safety (OSHA) Deficiencies: |