Page images
PDF
EPUB

ARNG COMPONENT

DD Form 1390 Supplemental Data
FY 1983 Military Construction Program

HILO/HAWAII
INSTALLATION/LOCATION

A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981):

[blocks in formation]

Permanent Facilities
Temporary Facilities

NONE

HIARNG COMMAND

($000)

0

0 )

Quantity/Unit of
Measure

C. Outstanding Pollution and Safety (OSHA) Deficiencies:

1.

Air Pollution

2. Water Pollution

3. Safety and Occupational Health

($000)

[blocks in formation]

EQUIP PROVIDED FROM OTHER FED APPR. NON ADD 10. DESCRIPTION OF PROPOSED CONSTRUCTION

(1)

Specially designed steel frame, metal sided hangar facility with built-up roof and load-bearing concrete floors. Externally attached one story special support offices of concrete block and masonry design. connections are included in this construction for mechanical and electrical equipment.

Utility

Air Conditioning

14 tons.

ADEQUATE : 0 SF

The

11. REQUIREMENT: 11,843 SF SUBSTANDARD: 4,990 SF PROJECT: This project will provide a maintenance support facility for the Hawaii Army National Guard aviation assets on the island of Hawaii. facility will support 11 aircraft in the performance of defense readiness objectives.

REQUIREMENT: This project is required to provide adequate support facilities for aviation assets assigned to the 1st Detachment, 1293 Infantry Co., Combat Support Aviation) being assigned to support the defense needs of the island of Hawaii. The project will provide hangar floor, allied shops, special support areas and utilities needed to accomplish the support mission. The proposed site is on State-owned land under the control and management of the Hawaii National Guard.

CURRENT SITUATION: The present AAFA facility was constructed in 1954 and is completely inadequate for the proposed requirements. Due to the nature of its construction, expansion is not feasible. At present, the existing structure is only minimally effective as an AAFA facility. Inadequate for future operations will be administration, operations and maintenance support areas. The existing facility is State-owned and will be disposed of after the new facility is completed in accordance with State laws.

[blocks in formation]

90-276 0-82-70

[blocks in formation]

414

ARMY AVIATION FLIGHT ACTIVITY (AAFA) IMPACT IF NOT PROVIDED: If a new facility is not provided, the deficiencies mentioned above will impact on the unit's overall readiness and will adversely affect the operational readiness of the Hawaii Army National Guard aviation assets on the island of Hawaii.

[blocks in formation]

PREVIOUS EDITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO. 1-43

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY....

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY.....

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT.....

E. DESIGN DATA (Estimated)

7

($000)

8

(PEOPLE)

885

($000)

N/A ($000)

[merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]

F.

4. CONSTRUCTION START...

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

[blocks in formation]

(month and year)

Cost ($000)

1

[blocks in formation]
[blocks in formation]
[blocks in formation]

RANGES ARE USED FOR WEEKEND TRAINING BY 18 UNITS FOR 27 WEEKENDS A YEAR
AND 20 TWO-WEEK TRAINING PERIODS

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

[blocks in formation]

28 JUL 1981

FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE
STATE RESERVE FORCES FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION.
THE BOARD RECOMMENDATIONS ARE UNILATERAL CONSTRUCTION.

9. LAND ACQUISITION REQUIRED

NONE

10. PROJECTS PLANNED IN NEXT FOUR YEARS

FY84 MACHINE GUN RANGE - $220

0
(Number of Acres)

"A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION

OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED."

[blocks in formation]

1 DEC 76 1390s

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO 1-44

« PreviousContinue »