A specially designed armory facility of permanent masonry-type construction brick and concrete block units with built-up roof and concrete floors. one-story structure with mechanical and electrical equipment. Air Conditioning 20 tons

SUBSTANDARD:

640 SF

11. REQUIREMENT: 36,533 SF ADEQUATE : 0 PROJECT: A new facility is requested to serve the peacetime mission of the assigned units. The space will permit all assigned aviation personnel to perform the necessary tasks that will improve their readiness posture in support of combat objectives. The existing mobile home cannot be expanded. The armories at Lawrenceville and Winder are located too far from the aviation support facility and aircraft to meet the armory requirements of the assigned units.

The new

REQUIREMENT: This facility is required to house the 151 Aviation Battalion, the 158 Military Intelligence Company and the 159 Military Intelligence Company. These units consist of 390 personnel. This armory will provide the necessary administration, indoor training areas and storage of equipment space to achieve the proficiency in required training and to accomplish the assigned readiness objectives. 6-acre site is owned by the Federal Government. CURRENT SITUATION: The existing 640 square foot mobile home is totally inadequate to meet even the most basic administrative requirements of the 159 Military Intelligence Company. The 151 Aviation Battalion is 40 miles and the 158 Military Intelligence Company is 55 miles from their aviation support facility and aircraft. Upon completion of the armory, the mobile home will be disposed of.

[blocks in formation]
[blocks in formation]

The assigned units will have to continue to use the totally inadequate facilities causing a severe impact on readiness, morale, and strength.

FORM

DD, 1391c

PREVIOUS BUITIONS MAY BE USED INTERNALLY
UNTIL EXHAUSTED

PAGE NO

1-36

[blocks in formation]

A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

B.

NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT
THE FUNCTION OF THE PROPOSED FACILITY....

C.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
PROPOSED FACILITY...

0

($000)

0
(PEOPLE)

0

($000)

D.

ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE
EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT..

[ocr errors]
[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

9/81

35%

100%

6/82

F.

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small]

EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

(month and year)

[blocks in formation]

DDDIC

1391c

PREVIOUS EDITION) NA BELDED INTERNALLY
UNTIL CAMAUSTED

[blocks in formation]
[blocks in formation]

NORMAL ADMINISTRATION FIVE DAYS PER WEEK WITH A TWO-DAY TRAINING ASSEMBLY PER MONTH

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS

[blocks in formation]

FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE

2 APR 1981

STATE RESERVE FORCES FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION.
THE BOARD RECOMMENDATIONS ARE UNILATERAL CONSTRUCTION.

9 LAND ACQUISITION REQUIRED

NONE

10. PROJECTS PLANNED IN NEXT FOUR YEARS

NONE

(Number of Acres)

"A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION

OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. "1