Page images
PDF
EPUB

2 DATE

1 COMPONENT

FY 1983 GUARD AND RESERVE ARNG

MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION

1 JAN 1982

4. AREA CONSTR
COST INDEX

1.11

STOCKTON, CALIFORNIA 5 FREQUENCY AND TYPE OF UTILIZATION

NORMAL MAINTENANCE AND ADMINISTRATION FIVE DAYS PER WEEK WITH A TWO-DAY
TRAINING ASSEMBLY PER MONTH

[blocks in formation]

6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS
ARNG: LODI

(20 MILES) 150-PERSON ARMORY
USAR: STOCKTON ( 3 MILES)
USNR: STOCKTON (10 MILES
USCG:

STOCKTON (10 MILES
USN: STOCKTON

(10 MILES USMC: STOCKTON (10 MILES) 7. PROJECTS REQUESTED IN THIS PROGRAM

[blocks in formation]

8 STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION

9 SEP 1981 FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE UNILATERAL CONSTRUCTION. 9 LAND ACQUISITION REQUIRED

0 NONE

onber of crew 10. PROJECTS PLANNED IN NEXT FOUR YEARS

NONE

"A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED."

[ocr errors][subsumed]

1390s

PAEVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE NO

1-30

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][subsumed][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][ocr errors]

DD Form 1390 Supplemental Data
FY 1983 Military Construction Program

ARNG COMPONENT

STOCKTON/ CALIFORNIA
INSTALLATION / LOCATION

CAARNG
COMMAND

($ 000)

A.

Estimated cost of Backlog of Real Property Maintenance
(BMAR) (as of September 30, 1981):

Permanent Facilities
Temporary Facilities

0

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

1

[ocr errors]

4

COMPONENT

2 DATE
83
ARNG FY 19 MILITARY CONSTRUCTION PROJECT DATA

1 JAN 1982 3 INSTALLATION AND LOCATION

PROJECT TITLE

ARMY AVIATION SUPPORT FACILITY STOCKTON, CALIFORNIA

KAASF) ADDITION/MODIFICATIONS 5. PROGRAM ELEMENT 6 CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST (5000) 55896A

211
246

680

[blocks in formation]

ARMY AVIATION SUPPORT FACILITY (AASF).

SF 37,243
ADDITION.

SF 4,534
MODIFICATIONS

SF 31,950
GROUND SUPPORT EQUIP STORAGE BLDG ADD. SF 759
SUPPORTING FACILITIES.
PAVING (FLEXIBLE).

SY 20,000
SHOULDERS

SY 11,500
WATER METER.

LS
TAXIWAY & HELIPAD LIGHTS.

LS
SITE DRAINAGE.

LS
SIDEWALK & RUN-UP PAD.

SF 11,000
SUBTOTAL.
CONTINGENCY (57).
SUPERVISION, INSP & OVERHEAD (1.32%). NON ADD
TOTAL REQUEST.
EQUIP PROVIDED FROM OTHER FED APPR...NON ADD

357 60.50 (274)

1.55 ( 50) 43.35 ( 33)

291 9.87 (197) 2.19 ( 25)

(6) (41)

(4) 1.65 (18)

648

32 (9) 680 (0)

10 DESCRIPTION OF PROPOSED CONSTRUCTION

Consists of building addition to provide operations area and office space constructed of tilt-up concrete. Modifications to include installing inching motor on overhead crane; eye wash, electrical upgrading, installing electric motor on hangar doors; door installation in engine room and upgrading finishes. Air Conditioning - 8 tons 11. REQUIREMENT: 52,228 SF

ADEQUATE: 14,985 SF SUBSTANDARD: 37,243 st PROJECT: This project is to improve the operation and safety at this activity. It will provide the essential work spaces identified in the current criteria and correct areas that do not comply with OSHA and flight safety standards. The taxiway will provide a new controlled access to the flight facility. REQUIREMENT: The administration, operations, maintenance and storage facilities provided by the existing facility do not meet the space criterid of National Guard Regulations for the aircraft assigned. CURRENT SITUATION: This facility was constructed in 1974. Additional requirements and the resultant changes in the construction criteria have added significant administrative, operation and shop areas. The trolley motor on the overhead crane does not allow inching in either of the lateral directions. Movement of the crane is controlled by a start-up button which makes precise placement of heavy aircraft turbines and enginees difficult and dangerous. The large existing hangar doors were designed to be opened manua lly. The hoverlane between the UH parking pads and the CH-47 parking pads was not paved or sodded during initial conIMPACT IF NOT PROVIDED: Facility will Continue to operate at

operateran optimum efficiency due to substandard work spaces and OSHA & safety violaDD, born 1391

1-32

PREVIOUS EDITIONS MAY BE USED INTERNALLY

UNTIL EXHAUSTED

PAGE MO

90-276 0-82-69

COMPONENT

2 DATE FY 1983 MILITARY CONSTRUCTION PROJECT DATA ARNG

1 JAN 1982 INSTALLATION AND LOCATION

BRONCT NUMBER

STOCKTON, CALIFORNIA
PRONTALE
ARMY AVIATION SUPPORT FACILITY ADDITION AND
MODIFICATION

SUPPLEMENTAL DATA

246

A.

B.

(PEOPLE

C.

ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY....

165

79000) NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY.

0

(PEOPLE) ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE PROPOSED FACILITY....

1,770

(5000) ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT....... N/A

75000) DESIGN DATA (Estimated)

D.

E.

[blocks in formation]

9783 Tmonth and year)

F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE
PROVIDED FROM OTHER APPROPRIATIONS:

Fiscal Year
Equipment

Procuring

Appropriated
Nome nclature
Appropriation

Or Requested

Cost ($000)

NONE

DD DICT

O, 13910

و دوم) ۱۸ دوره ۱۰

۲۰٫۱ ا دب ، وردع

* UI AUSTID

PAGE NO

« PreviousContinue »