ARNG COMPONENT DD Form 1390 Supplemental Data FY 1983 Military Construction Program SUNNY SLOPE/ARIZONA A. Estimated Cost of Backlog of Real Property Maintenance (BMAR) (as of September 30, 1981): AZARNG ($000) Quantity/Unit of C. Outstanding Pollution and Safety (OSHA) Deficiencies: 1. Air Pollution 2. Water Pollution 3. Safety and Occupational Health ($000) 0 0 Alteration to the existing and addition of a one-story masonry wall structure, slab on grade, built-up roof and necessary supporting utilities. Air Conditioning 6 tons 11. REQUIREMENT: 19,231 SF ADEQUATE : 0 SUBSTANDARD: 5,788 SF PROJECT: This facility is required to serve the peacetime mission of the assigned unit. The armory addition/alteration will eliminate substandard facilities in the present armory. REQUIREMENT: The facility will house the 855 Military Police Company consisting of 164 persons. This armory will provide the necessary addition of assembly hall, rifle range, classrooms, library/classroom, learning center, administration, lockers, training aids storage, unit storage, food storage, scullery, public toilets, facilities maintenance/ storage, flammable materials storage and alteration of assembly hall, library classroom, administration, lockers, unit storage, food preparation, toilets/showers and public toilets which will meet authorized criteria. These changes are essential to achieve proficiency in required training and to accomplish assigned readiness objectives. CURRENT SITUATION: The present armory was constructed in 1954 on 5 acres of land in Sunnyslope, AZ. There is inadequate parking and building space. However, no additional parking or security fencing is requested. IMPACT IF NOT PROVIDED: The assigned unit will be required to use the present substandard facility which impacts adversely on training, maintenance, recruiting/retention and readiness of the unit. A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY.... 0 ($000) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 0 D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) 1. STATUS ($000) 0 ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring Fiscal Year 8/80 100% 100% 10/81 ($000) 0 0 26 26 0 9/83 (month and year) Cost ($000) NONE PREVIOUS EDITION, MATSE OLD INTERNALLY NORMAL ADMINISTRATION FIVE DAYS PER WEEK WITH A TWO-DAY TRAINING ASSEMBLY PER MONTH 6 OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS 24 SEP 1981 FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE "A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED." |