One story addition and alterations to the existing building consisting of: masonry wall structure, slab on grade, built-up roof and necessary supporting utilities. 11. REQUIREMENT: 17,142 SF PROJECT: This facility is required to serve the peacetime mission of the assigned unit. The armory addition/alteration will eliminate substandard facilities in the present armory. REQUIREMENT: The facility will house the 1057th Ordnance Company (-) consisting of 118 persons. This project will provide the necessary addition to assembly hall, rifle range, classrooms, library/classroom, learning center, administration, lockers, training aids storage, unit storage, food storage, food prep, scullery, public toilets, facilities maint/storage, flammable material storage, and alteration of assembly hall, library classroom, administration, lockers unit storage, food prep, toilets/ showers and public toilets. These changes are essential to achieve proficiency in required training and to accomplish assigned readiness objectives. CURRENT SITUATION: The present armory was constructed in 1954 on 4.29 acres of land. An additional 5.01 acres are available for the armory addition/alteration. There is inadequate parking and building space. No other facility exists within 15 miles which has adequate space to accommodate this unit. FORM DD1 DEC 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO 1-10 ($000) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE E. DESIGN DATA (Estimated) 1. STATUS (PEOPLE) 0 ($000) ($000) F. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE Equipment Nomenclature Procuring NONE Fiscal Year ($000) 23 23 0 9/83 (month and year) Cost ($000) 11. REQUIREMENT: CONTINUED IMPACT IF NOT PROVIDED: The assigned unit will be required to use the present substandard facility, which impacts adversely on training, morale, esprit de corps, maintenance, recruiting/retention and readiness of the unit. NORMAL ADMINISTRATION FIVE DAYS PER WEEK WITH TWO 2-DAY TRAINING 6 OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 25 MILE RADIUS 22 JUL 1981 FACILITIES IDENTIFIED IN ITEM 6 HAVE BEEN EXAMINED BY THE 9 LAND ACQUISITION REQUIRED NONE 0 (Number of Acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS NONE "A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED." FORM DD1 DEC 76 1390s 90-276 0-82-67 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO 1-12 |