Military Construction Appropriations for 1983: Hearings Before a Subcommittee of the Committee on Appropriations, House of Representatives, Ninety-seventh Congress, Second Session, Subcommittee on Military Construction Appropriations, Part 2

Front Cover

From inside the book

What people are saying - Write a review

We haven't found any reviews in the usual places.

Other editions - View all

Common terms and phrases

Popular passages

Page 48 - Projects have been sited to avoid or reduce the risk of flood loss, minimize the impact of floods or human safety, health and welfare, preserve and enhance the natural and beneficial values of wetlands and minimize the destruction, loss or degradation of wetlands.
Page 1324 - Guard installations have been developed, reviewed, and selected for early economic payoff and maximum reduction of energy consumption. Projects include improvement to existing facilities and utilities systems to upgrade design, eliminate waste, and install energy-saving devices. Criteria for all new facility construction in the...
Page 867 - FACILITY 665 ($000) D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE EXISTING FACILITY IF NEW FACILITY IS A REPLACEMENT. NA ($000) E. DESIGN DATA (Estimated) 1 . STATUS a. Date Design Started J"1 j| ' b. Percent Complete as of January l, 1982 -^ c. Percent Complete as of October 1, 19^".
Page 1592 - SUPPLEMENTAL DATA A. ESTIMATED ANNUAL COST TO OPERATE THE PROPOSED FACILITY. B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.
Page 649 - To acquire in fee or restrictive easement the necessary land interest for expanded clear zones at the ends of the runway. REQUIREMENT: As part of the Air Installation Compatible Use Zones (AICUZ) program, expanded clear zones have been delineated and identified for property rights acquisition to prevent development in this high accident potential area. CURRENT SITUATION: Expanding developments accompanying recent population growth in urban areas have resulted in progressive encroachment upon Air...
Page 769 - FACILITY 250 ($000) B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C.
Page 1214 - B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT THE FUNCTION OF THE PROPOSED FACILITY 0 (PEOPLE) C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE PROPOSED FACILITY — ($000) D.

Bibliographic information