tions made in a FNSI based on its supporting environmental assessment or the ROD for a EIS. The EPA shall condition a grant, or seek other ways, to ensure that the grantee will comply with such environmental review determinations.

(c) FNSI/EIS determination. The responsible official shall apply the criteria under § 6.509 to the following: (1) A complete facilities plan; (2) The EID;

(3) The preliminary environmental assessment; and

(4) Other documentation, deemed necessary by the responsible official adequate to make an EIS determination by EPA. Where EPA determines that an EIS is to be prepared, there is no need to prepare a formal environmental assessment. If EPA or the State identifies deficiencies in the EID, preliminary environmental assessment, or other supporting documentation, necessary corrections shall be made to this documentation before the conditions of the Step 1 grant are considered satisfied or before the Step 3 or Step 2+3 application is considered complete. The responsible official's determination to issue a FNSI or to prepare an EIS shall constitute final Agency action, and shall not be subject to administrative review under 40 CFR Part 30 Subpart L.

[50 FR 26317, June 25, 1985, as amended at 51 FR 32612, Sept. 12, 1986]

[blocks in formation]

(a) Purpose. Under certain circumstances the building of a component/ portion of a wastewater treatment system may be justified in advance of completing all NEPA requirements for the remainder of the system(s). When there are overriding considerations of cost or impaired program effectiveness, the responsible official may award a construction grant, or approve procurement by other than EPA funds, for a discrete component of a complete wastewater treatment system(s). The process of partitioning the environmental review for the discrete component shall comply with the criteria and procedures described in paragraph (b) of this section. In addition, all reasonable alternatives for

the overall wastewater treatment works system(s) of which the component is a part shall have been previously identified, and each part of the environmental review for the remainder of the overall facilities system(s) in the planning area in accordance with § 6.502(b)(3) shall comply with all requirements under § 6.506.

(b) Criteria for partitioning. (1) Projects may be partitioned under the following circumstances:

(i) To overcome impaired program effectiveness, the project component, in addition to meeting the criteria listed in paragraph (b)(2) of this section, must immediately remedy severe public health, water quality or other environmental problem; or

[ocr errors]

(ii) To significantly reduce direct costs on EPA projects, or other related public works projects, the project component (such as major pieces of equipment, portions of conveyances or small structures) in addition to meeting the criteria listed in paragraph (b)(2) of this section, must achieve a cost savings to the federal government and/or to the grantee's or potential grantee's overall costs incurred in procuring the wastewater treatment component(s) and/or the installation of other related public works projects funded in coordination with other federal, State, tribal or local agencies.

(2) The project component also must:

(i) Not foreclose any reasonable alternatives identified for the overall wastewater treatment works system(s);

(ii) Not cause significant adverse direct or indirect environmental impacts including those which cannot be acceptably mitigated without completing the entire wastewater treatment system of which the component is a part; and

(iii) Not be highly controversial.

(c) Requests for partitioning. The applicant's or State's request for partitioning must contain the following:

(1) A description of the discrete component proposed for construction before completing the environmental review of the entire facilities plan;

(2) How the component meets the above criteria;

(3) The environmental information required by § 6.506 of this subpart for the component; and

(4) Any preliminary information that may be important to EPA in an EIS determination for the entire facilities plan (§ 6.509).

(d) Approval of requests for partitioning. The responsible official shall: (1) Review the request for partitioning against all requirements of this subpart;

(2) If approvable, prepare and issue a FNSI in accordance with § 6.508;

(3) Include a grant condition prohibiting the building of additional or different components of the entire facilities system(s) in the planning area as described in § 6.502(b)(3)(i).

[50 FR 26317, June 25, 1985, as amended at 51 FR 32612, Sept. 12, 1986]

§ 6.508 Finding of No Significant Impact (FNSI) determination.

(a) Criteria for producing and distributing FNSIs. If, after completion of the environmental review, EPA determines that an EIS will not be required, the responsible official shall issue a FNSI in accordance with §§ 6.105(f) and 6.400(d). The FNSI will be based on EPA's independent review of the preliminary environmental assessment and any other environmental information deemed necessary by the responsible official consistent with the requirements of § 6.506(c). Following the Agency's independent review, the environmental assessment will be finalized and either be incorporated into, or attached to, the FNSI. The FNSI shall list all mitigation measures as defined in § 1508.20 of this title, and specifically identify those mitigation measures necessary to make the recommended alternative environmentally acceptable.

(b) Proceeding with grant awards. (1) Once an environmental assessment has been prepared and the issued FNSI becomes effective for the treatment works within the study area, grant awards may proceed without preparation of additional FNSIS, unless the responsible official later determines that the project or environmental conditions have changed significantly from that which underwent environmental review.

(2) For all environmental assessment/FNSI determinations:

(i) That are five or more years old on projects awaiting Step 2+3 or Step 3 grant funding, the responsible official shall re-evaluate the project, environmental conditions and public views and, prior to grant award, either:

(A) Reaffirm-issue a public notice reaffirming EPA's decision to proceed with the project without revising the environmental assessment;

(B) Supplement—update information and prepare, issue and distribute a revised EA/FNSI in accordance with §§ 6.105(f) and 6.400(d); or

(C) Reassess-withdraw the FNSI and publish a notice of intent to produce an EIS followed by the preparation, issuance and distribution of the EIS/ROD.

(ii) That are made on projects that have been awarded a Step 2+3 grant, the responsible official shall, at the time of plans and specifications review under 35.2202(b) of this title, assess whether the environmental conditions or the project's anticipated impact on the environment have changed and, prior to plans and specifications approval, advise the Regional Administrator if additional environmental review is necessary.

[51 FR 32612, Sept. 12, 1986]

§ 6.509 Criteria for initiating Environmental Impact Statements (EIS).

(a) Conditions requiring EISs. (1) The responsible official shall assure that an EIS will be prepared and issued when it is determined that the treatment works or collector system will cause any of the conditions under § 6.108 to exist, or when

(2) The treated effluent is being discharged into a body of water where the present classification is too lenient or is being challenged as too low to protect present or recent uses, and the effluent will not be of sufficient quality or quantity to meet the requirements of these uses.

(b) Other conditions. The responsible official shall also consider preparing an EIS if: The project is highly controversial; the project in conjunction with related Federal, State, local or tribal resource projects produces

30-136 0-89-5

significant cumulative impacts; or if it is determined that the treatment works may violate federal, State, local or tribal laws or requirements imposed for the protection of the environment.

§ 6.510 Environmental Impact Statement (EIS) preparation.

(a) Steps in preparing EISS. In addition to the requirements specified in Subparts A, B, C, and D of this part, the responsible official will conduct the following activities:

(1) Notice of intent. If a determination is made that an EIS will be required, the responsible official shall prepare and distribute a notice of intent as required in § 6.105(e) of this part.

(2) Scoping. As soon as possible, after the publication of the notice of intent, the responsible official will convene a meeting of affected federal, State and local agencies, or affected Indian tribes, the grantee and other interested parties to determine the scope of the EIS. A notice of this scoping meeting must be made in accordance with § 6.400(a) and 40 CFR 1506.6(b). As part of the scoping meeting EPA, in cooperation with any delegated State, will as a minimum:

(i) Determine the significance of issues for and the scope of those significant issues to be analyzed in depth, in the EIS;

(ii) Identify the preliminary range of alternatives to be considered;

(iii) Identify potential cooperating agencies and determine the information or analyses that may be needed from cooperating agencies or other parties;

(iv) Discuss the method for EIS preparation and the public participation strategy;

(v) Identify consultation requirements of other environmental laws, in accordance with Subpart C; and

(vi) Determine the relationship between the EIS and the completion of the facilities plan and any necessary coordination arrangements between the preparers of both documents.

(3) Identifying and evaluating alternatives. Immediately following the scoping process, the responsible official shall commence the identification and evaluation of all potentially viable

alternatives to adequately address the range of issues identified in the scoping process. Additional issues may be addressed, or others eliminated, during this process and the reasons documented as part of the EIS.

(b) Methods for preparing EISs. After EPA determines the need for an EIS, it shall select one of the following methods for its preparation:

(1) Directly by EPA's own staff;

(2) By EPA contracting directly with a qualified consulting firm;

(3) By utilizing a third party method, whereby the responsible official enters into "third party agreements" for the applicant to engage and pay for the services of a third party contractor to prepare the EIS. Such agreement shall not be initiated unless both the applicant and the responsible official agree to its creation. A third party agreement will be established prior to the applicant's EID and eliminate the need for that document. In proceeding under the third party agreement, the responsible official shall carry out the following practices:

(i) In consultation with the applicant, choose the third party contractor and manage that contract;

(ii) Select the consultant based on ability and an absence of conflict of interest. Third party contractors will be required to execute a disclosure statement prepared by the responsible official signifying they have no financial or other conflicting interest in the outcome of the project; and

(iii) Specify the information to be developed and supervise the gathering, analysis and presentation of the information. The responsible official shall have sole authority for approval and modification of the statements, analyses, and conclusions included in the third party EIS; or

(4) By utilizing a joint EPA/State process on projects within States which have requirements and procedures comparable to NEPA, whereby the EPA and the State agree to prepare a single EIS document to fulfill both federal and State requirements. Both EPA and the State shall sign a Memorandum of Agreement which includes the responsibilities and procedures to be used by both parties for

the preparation of the EIS as provided for in 40 CFR 1506.2(c).

§ 6.511 Record of Decision (ROD) for EISS and identification of mitigation

measures.

(a) Record of Decision. After a final EIS has been issued, the responsible official shall prepare and issue a ROD in accordance with 40 CFR 1505.2 prior to, or in conjunction with, the approval of the facilities plan. The ROD shall include identification of mitigation measures derived from the EIS process including grant conditions which are necessary to minimize the adverse impacts of the selected alternative.

(b) Specific mitigation measures. Prior to the approval of a facilities plan, the responsible official must ensure that effective mitigation measures identified in the ROD will be implemented by the grantee. This should be done by revising the facilities plan, initiating other steps to mitigate adverse effects, or including conditions in grants requiring actions to minimize effects. Care should be exercised if a condition is to be imposed in a grant document to assure that the applicant possesses the authority to fulfill the conditions.

(c) Proceeding with grant awards. (1) Once the ROD has been prepared on the selected, or preferred, alternative(s) for the treatment works described within the EIS, grant awards may proceed without the preparation of supplemental EISS unless the responsible official later determines that the project or the environmental conditions described within the current EIS have changed significantly from the previous environmental review in accordance with § 1502.9(c) of this title.

(2) For all EIS/ROD determinations: (i) That are five or more years old on projects awaiting Step 2+3 or Step 3 grant funding, the responsible official shall re-evaluate the project, environmental conditions and public views and, prior to grant award, either:

(A) Reaffirm-issue a public notice reaffirming EPA's decision to proceed with the project, and documenting that no additional significant impacts were identified during the re-evalua

tion which would require supplementing the EIS; or

(B) Supplement-conduct additional studies and prepare, issue and distribute a supplemental EIS in accordance with 6.404 and document the original, or any revised, decision in an addendum to the ROD.

(ii) That are made on projects that have been awarded a Step 2+3 grant, the responsible official shall, at the time of plans and specifications review under 35.2202(b) of this title, assess whether the environmental conditions or the project's anticipated impact on the environment have changed, and prior to plans and specifications approval, advise the Regional Administrator if additional environmental review is necessary.

[50 FR 26317, June 25, 1985, as amended at 51 FR 32613, Sept. 12, 1986]

§ 6.512 Monitoring for compliance.

(a) General. The responsible official shall ensure adequate monitoring of mitigation measures and other grant conditions identified in the FNSI, or ROD.

(b) Enforcement. If the grantee fails to comply with grant conditions, the responsible official may consider applying any of the sanctions specified in 40 CFR 30.900.

§ 6.513 Public participation.

(a) General. Consistent with public participation regulations in Part 25 of this title, and Subpart D of this part, it is EPA policy that certain public participation steps be achieved before the State and EPA complete the environmental review process. As a minimum, all potential applicants that do not qualify for a categorical exclusion shall conduct the following steps in accordance with procedures specified in Part 25 of this title:

(1) One public meeting when alternatives have been developed, but before an alternative has been selected, to discuss all alternatives under consideration and the reasons for rejection of others; and

(2) One public hearing prior to formal adoption of a facilities plan to discuss the proposed facilities plan and any needed mitigation measures.

(b) Coordination. Public participation activities undertaken in connection with the environmental review process should be coordinated with any other applicable public participation program wherever possible.

(c) Scope. The requirements of 40 CFR 6.400 shall be fulfilled, and consistent with 40 CFR 1506.6, the responsible official may institute such additional NEPA-related public participation procedures as are deemed necessary during the environmental review process.

[50 FR 26317, June 25, 1985, as amended at 51 FR 32613, Sept. 12, 1986]

§ 6.514 Delegation to States.

(a) General. Authority delegated to the State under section 205(g) of the Clean Water Act to review a facilities plan may include all EPA activities under this part except for the following:

(1) Determinations of whether or not a project qualifies for a categorical exclusion;

(2) Determinations to partition the environmental review process;

(3) Finalizing the scope of an EID when required to adequately conclude an independent review of a preliminary environmental assessment;

(4) Finalizing the scope of an environmental assessement, and finalization, approval and issuance of a final environmental assessment;

(5) Determination to issue, and issuance of, a FNSI based on a completed (§ 6.508) or partitioned (§ 6.507(d)(2)) environmental review;

(6) Determination to issue, and issuance of, a notice of intent for preparing an EIS;

(7) Preparation of EISS under § 6.510(b) (1) and (2), final decisions required for preparing an EIS under § 6.510(b)(3), finalizing the agreement to prepare an EIS under § 6.510(b)(4), finalizing the scope of an EIS, and issuance of draft, final and supplemental EISS;

(8) Preparation and issuance of the ROD based on an EIS;

(9) Final decisions under other applicable laws described in subpart C of this part;

(10) Determination following re-evaluations of projects awaiting grant

[blocks in formation]

(11) Maintenance of official EPA monthly status reports as required under § 6.402(b).

(b) Elimination of duplication. The responsible official shall assure that maximum efforts are undertaken to minimize duplication within the limits described under paragraph (a) of this section. In carrying out requirements under this subpart, maximum consideration shall be given to eliminating duplication in accordance with § 1506.2 of this title. Where there are State or local procedures comparable to NEPA, EPA should enter into memoranda of understanding with these States concerning workload distribution and responsibilities not specifically reserved to EPA in paragraph (a) of this section for implementing the environmental review and facilities planning process. [50 FR 26317, June 25, 1985, as amended at 51 FR 32613, Sept. 12, 1986]

Subpart F-Environmental

Review Procedures for the New Source NPDES Program

§ 6.600 Purpose.

(a) General. This subpart provides procedures for carrying out the environmental review process for the issuance of new source National Pollutant Discharge Elimination System

(NPDES) discharge permits authorized under section 306, section 402, and section 511(c)(1) of the Clean Water Act.

(b) Permit regulations. All references in this subpart to the "permit regulations" shall mean Parts 122 and 124 of Title 40 of the CFR relating to the NPDES program.

« PreviousContinue »