Military Construction Appropriations for 1983: Hearings Before a Subcommittee of the Committee on Appropriations, House of Representatives, Ninety-seventh Congress, Second Session, Subcommittee on Military Construction Appropriations, Part 1U.S. Government Printing Office, 1982 - United States |
From inside the book
Results 1-5 of 100
Page 171
... Permanent Facilities Temporary Facilities ( Quantity / Unit of Measure C. Outstanding Pollution and Safety ( OSHA ) Deficiencies : 1. Air Pollution 2 . Water Pollution · 3. Safety and Occupational Health ( $ 000 ) 0 0 1. COMPONENT FY ...
... Permanent Facilities Temporary Facilities ( Quantity / Unit of Measure C. Outstanding Pollution and Safety ( OSHA ) Deficiencies : 1. Air Pollution 2 . Water Pollution · 3. Safety and Occupational Health ( $ 000 ) 0 0 1. COMPONENT FY ...
Page 177
... permanent administration and supply facilities for 1st Corps Support Command units now housed in temporary facilities , and for unit activations scheduled for Fort Bragg during the period September 1982 through April 1983 that include ...
... permanent administration and supply facilities for 1st Corps Support Command units now housed in temporary facilities , and for unit activations scheduled for Fort Bragg during the period September 1982 through April 1983 that include ...
Page 193
... permanent building complete with required utilities services , fire protection , communications , paving , walks , curb and gutter , storm drainage and site improvements . Heating from a self contained plant . Not sited in a flood plain ...
... permanent building complete with required utilities services , fire protection , communications , paving , walks , curb and gutter , storm drainage and site improvements . Heating from a self contained plant . Not sited in a flood plain ...
Page 198
... permanent ranges for use in training with the TOW and Dragon missiles and the attack helicopter . The two ranges will be collocated . Work includes provision of moving target tracks with target carriers for both ranges , target carrier ...
... permanent ranges for use in training with the TOW and Dragon missiles and the attack helicopter . The two ranges will be collocated . Work includes provision of moving target tracks with target carriers for both ranges , target carrier ...
Page 208
... permanent barracks buildings constructed in 1931. Overhead steam and water pipes and other service lines prohibit training for any system that produces classified output . Areas adjacent to the buildings which can be used for simulated ...
... permanent barracks buildings constructed in 1931. Overhead steam and water pipes and other service lines prohibit training for any system that produces classified output . Areas adjacent to the buildings which can be used for simulated ...
Common terms and phrases
1983 MILITARY CONSTRUCTION 29 January ADDITIONAL PERSONNEL NECESSARY Appropriation Or Requested Barracks CATEGORY CODE CONSTRUCTION PROJECT DATA CONSTRUCTION START Planned COST COST 5000 COST ESTIMATES ITEM COST TO OPERATE COST Total Data Design Completed DATE 22 Jan Date Design Started DATE FY DESCRIPTION OF PROPOSED DESIGN DATA Estimated Equipment Nomenclature Procuring ESTIMATED LIFE-CYCLE COST EXISTING FACILITY flood plain Fort Carson Fort Hood Fort Irwin Fort Polk Fort Rucker FY 1983 MILITARY FY of Appropriation Inspection & Overhead INSTALLATION AND LOCATION ITEM U/M QUANTITY MAINTAIN THE PROPOSED MILITARY CONSTRUCTION PROGRAM MILITARY CONSTRUCTION PROJECT Nomenclature Procuring Appropriation NUMBER OF ADDITIONAL OPERATE AND MAINTAIN OPERATE PROPOSED FACILITY Percent Complete Pine Bluff Arsenal Plans and Specs Primary Facility Procuring Appropriation FY Production of Plans PROJECT NUMBER QUANTITY UNIT COST Requested Cost $000 Standard or Definitive Tactical Equipment Total Contract Cost Total Request Rounded U/M QUANTITY UNIT UNIT COST COST
Popular passages
Page 1258 - ... the Secretary of Defense determines that deferral of such construction for inclusion in the next Military Construction Authorization Act would be inconsistent with interests of national security, and in connection therewith to acquire, construct, convert, rehabilitate, or install permanent or temporary public works, including land acquisition, site preparation, appurtenances, utilities, and equipment...
Page 1314 - Defense available for military construction as he may designate, to be merged with and to be available for the same purposes, and for the same time period, as the appropriation or fund to which transferred: Provided further, That of the amount appropriated, not to exceed...
Page 134 - For acquisition, construction, installation, and equipment of temporary or permanent public works, military installations, facilities, and real property for the Army as currently authorized by law...
Page 893 - To maintain and operate facilities and provide services and material to support operations of a Marine Aircraft wing, or units thereof, and other activities and units as designated by the Commandant of the Marine Corps in coordination with the Chief of Naval Operations.
Page 1078 - Modernization 10. Mission or Major Functions: Maintain and operate facilities and provide services and material to support operations of aviation activities and units of the Operating Forces of the Navy and other activities and units, as designated by the Chief of Naval Operations.
Page 1258 - ... if the Secretary of Defense determines that deferral of such construction for inclusion in the next military construction authorization Act would be Inconsistent with interests of national security, and in connection therewith to...
Page 1263 - Provide housing, training facilities, logistical support, and certain administrative support for Fleet Marine Force units and other units assigned. Conduct specialized schools and other training as directed.
Page 802 - point source" discharger to obtain a permit which specifies the allowable amount and constituents of the effluent. The permit also contains a schedule specifying the dates by which the discharger will achieve compliance. These projects provide improvements to sanitary sewage collection and treatment systems to satisfy the water quality criteria and permit requirements.
Page 1258 - Navy, or his designee, shall notify the Committees on Armed Services of the Senate and House of Representatives, immediately upon reaching a final decision to implement, of the cost of construction of any public work undertaken under this section, including those real estate actions pertaining thereto.
Page 1491 - For the United States share of the cost of multilateral programs for the acquisition or construction of military facilities and installations, including international military headquarters, for the collective defense of the North Atlantic Treaty Area...