C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE D. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 501 ($000) 0 (PEOPLE) 8,738 10,032 5 Oct 81 35 100 · Yes 8. Standard or Definitive Design F. (month and year) EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM DD 1391c PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO 16A Not supply buildings for six companies. Utility services are included in PN B302-373. Eleven temporary-type World War II mobilization buildings, totaling 39,460 SF will be demolished to clear the construction site. sited in a flood plain. Heating from a central heat plant. Air Conditioning - 48 Tons. 11. REQUIREMENT: 1,270,185 SF Adequate: 665,284 SF Substandard: 176,896 SF PROJECT: Construct six company administration and supply buildings. REQUIREMENT: This project is needed to provide adequate permanent administration and supply facilities for 1st Corps Support Command units now housed in temporary facilities, and for unit activations scheduled for Fort Bragg during the period September 1982 through April 1983 that include chemical and petroleum supply companies. CURRENT SITUATION: There are no adequate existing facilities at Fort Bragg that can be converted for use. All permanent facilities are now in use and expected to continue. Existing temporary type structures are wooden frame, open area buildings, originally designed as temporary barracks. Their high maintenance and operational cost and their small size per building make these buildings an impractical choice for this requirement. Extensive upgrade would be required to these buildings, vet they would still be substandard temporary type structures. IMPACT IF NOT PROVIDED: Inadequate temporary type World War II mobilization buildings will continue in use. MAY A. ESTIMATED ANNUAL COST TO OPERATE PROPOSED FACILITY....... B. NUMBER OF ADDITIONAL PERSONNEL NECESSARY TO CARRY OUT C. ESTIMATED LIFE-CYCLE COST TO OPERATE AND MAINTAIN THE 120 ($000) 0 (PEOPLE) 2,317 N/A 27 Aug 81 60 100 1 Oct 82 2. &. Standard or Definitive Design - Yes No Fort Bragg, NC F. Apr 83 (month and year) EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM Total Request Total Request (Rounded) Installed Equipment Other Appropriations 10. DESCRIPTION OF PROPOSED CONSTRUCTION 2,066 103 2,169 109 2,278 2,300 Construct a tactical equipment shop with storage building, flammable storehouse, oil-house, dispatch office, grease racks, wash platform, fuel storage and dispensing area, hardstand and supporting facilities. Heating from a self-contained plant. Not sited in a flood plain. Air Conditioning 2 Tons 11. REQUIREMENT: 650,659 SF Adequate: 211,696 SF Substandard: 287,255 SF PROJECT: Construction of a tactical equipment shop. REQUIREMENT: This project is required to provide organizational level maintenance facilities for the 101st Chemical Company, the 134th Quartermaster Company and the 196th Transportation Helicopter Company. CURRENT SITUATION: No installation assets are currently assigned to the 101st Chemical Company or the 134th Quartermaster Company. The 196th Transportation Helicopter Company is using one bay in a World War II wood and metal frame mobilization structure assigned to the 269th Aviation Battalion (Combat). IMPACT IF NOT PROVIDED: No facilities are available for these unit activations. Activation before construction will require these units to be assigned tents or share overcrowded shops assigned to other units which will adversely affect mission accomplishment, readiness posture and troop morale. |