contracting officer, on the basis of legal advice, shall take appropriate action to assert the Government's claim for such damages in accordance with Subpart F of Part 163 of this chapter. [29 F.R. 2833, Feb. 29, 1964]

Subpart G-Clauses

§ 8.700 Scope of subpart.

This subpart contains certain contract clauses related to the termination of contracts for the convenience of the Government and for default. Special purpose clauses when authorized by Departmental procedures and consistent with the policies set forth in this subchapter may be used in appropriate

cases.

[25 F.R. 14227, Dec. 31, 1960]

§ 8.701 Termination clause for fixedprice contracts.

(a) Except as otherwise permitted by § 8.705 and paragraph (b) of this section, the following clause shall be used in any fixed-price contract in excess of $2,500 for supplies or experimental, developmental, or research work other than experimental, development, or research work with educational or nonprofit institutions, where no profit is contemplated. The following clause shall be used in all fixed price construction contracts in excess of $10,000 except that paragraph (e) and (f) thereof shall be deleted and the paragraphs in paragraph (c) of this section shall be used.

TERMINATION FOR CONVENIENCE OF THE
GOVERNMENT (JAN. 1961)

(a) The performance of work under this contract may be terminated by the Government in accordance with this clause in whole, or from time to time in part, whenever the Contracting Officer shall determine that such termination is in the best interests of the Government. Any such termination shall be effected by delivery to the Contractor of a Notice of Termination specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective.

(b) After receipt of a Notice of Termi; nation, and except as otherwise directed by the Contracting Officer, the Contractor shall:

(1) Stop work under the contract on the date and to the extent specified in the Notice of Termination;

(2) Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of such portion of the work under the contract as is not terminated;

(3) Terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the Notice of Termination;

(4) Assign to the Government, in the manner, at the times, and to the extent directed by the Contracting Officer, all of the right, title, and interest of the Contractor under the orders and subcontracts so terminated, in which case the Government shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts;

(5) Settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts, with the approval or ratification of the Contracting Officer, to the extent he may require, which approval or ratification shall be final for all the purposes of this clause;

(6) Transfer title and deliver to the Government, in the manner, at the times, and to the extent, if any, directed by the Contracting Officer, (A) the fabricated or unfabricated parts, work in process, completed work, supplies, and other material produced as a part of, or acquired in connection with the performance of, the work terminated by the Notice of Termination, and (B) the completed or partially completed plans, drawings, information and other property which, if the contract had been completed, would have been required to be furnished to the Government;

(7) Use its best efforts to sell, in the manner, at the times, to the extent, and at the price or prices directed or authorized by the Contracting Officer, any property of the types referred to in (6) above: Provided, however, That the Contractor (A) shall not be required to extend credit to any purchaser, and (B) may acquire any such property under the conditions prescribed by and at a price or prices approved by the Contracting Officer; And provided further, That the proceeds of any such transfer or disposition shall be applied in reduction of any payments to be made by the Government to the Contractor under this contract or shall otherwise be credited to the price or cost of the work covered by this contract or paid in such other manner as the Contracting Officer may direct;

(8) Complete performance of such part of the work as shall not have been terminated by the Notice of Termination; and

(9) Take such action as may be necessary, or as the Contracting Officer may direct, for the protection and preservation of the property related to this contract which is in the possession of the Contractor and in which the Government has or may acquire an interest.

At any time after expiration of the plant clearance period, as defined in 32 CFR Part 8, as it may be amended from time to time, the Contractor may submit to the Contracting Officer a list, certified as to quantity and

quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by the Contracting Officer, and may request the Government to remove such items or enter into a storage agreement covering them. Not later than fifteen (15) days thereafter, the Government will accept title to such items and remove them or enter into a storage agreement covering the same: Provided, That the list submitted shall be subject to verification by the Contracting Officer upon removal of the items, or if the items are stored, within forty-five (45) days from the date of submission of the list, and any necessary adjustment to correct the list as submitted shall be made prior to final settlement.

(c) After receipt of a Notice of Termination, the Contractor shall submit to the Contracting Officer its termination claim, in the form and with certification prescribed by the Contracting Officer. Such claim shall be submitted promptly but in no event later than one year from the effective date of termination, unless one or more extensions in writing are granted by the Contracting Officer, upon request of the Contractor made in writing within such one year period or authorized extension thereof. However, if the Contracting Officer determines that the facts justify such action, he may receive and act upon any such termination claim at any time after such one year period or any extension thereof. Upon failure of the Contractor to submit its termination claim within the time allowed, the Contracting Officer may, subject to any Settlement Review Board approvals required by 32 CFR Part 8 in effect as of the date of execution of this contract, determine, on the basis of information available to him, the amount, if any, due to the Contractor by reason of the termination and shall thereupon pay to the Contractor the amount so determined.

(d) Subject to the provisions of paragraph (c), and subject to any Settlement Review Board approvals required by 32 CFR Part 8 in effect as of the date of execution of this contract, the Contractor and the Contracting Officer may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or partial termination of work pursuant to this clause, which amount or amounts may include a reasonable allowance for profit on work done: Provided, That such agreed amount or amounts, exclusive of settlement costs, shall not exceed the total contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. Nothing in paragraph (e) of this clause, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor and the Contracting Officer to agree upon the

whole amount to be paid to the Contractor by reason of the termination of work pursuant to this clause, shall be deemed to limit, restrict, or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph (d).

(e) In the event of the failure of the Contractor and the Contracting Officer to agree as provided in paragraph (d) upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this clause, the Contracting Officer shall, subject to any Settlement Review Board approvals required by 32 CFR Part 8 in effect as of the date of execution of this contract, determine, on the basis of information available to him, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined as follows:

(1) For completed supplies accepted by the Government (or sold or acquired as provided in paragraph (b) (7) above) and not theretofore paid for, a sum equivalent to the aggregate price for such supplies computed in accordance with the price or prices specified in the contract, appropriately adjusted for any saving of freight or other charges;

(2) The total of

(A) The costs incurred in the performance of the work terminated, including initial costs and preparatory expense allocable thereto, but exclusive of any costs attributable to supplies paid or to be paid for under paragraph (e) (1) hereof;

(B) The cost of settling and paying claims arising out of the termination of work under subcontracts or orders, as provided in paragraph (b) (5) above, which are properly chargeable to the terminated portion of the contract (exclusive of amounts paid or payable on account of supplies or materials delivered or services furnished by subcontractors or vendors prior to the effective date of the Notice of Termination, which amounts shall be included in the costs payable under (A) above; and

(C) A sum, as a profit, equal to 2 percent of that part of the amount determined under (A) above which represents the cost of articles and materials not processed by the Contractor, plus a sum equal to 8 percent of the remainder of such amount, but the aggregate of such sums shall not exceed 6 percent of the whole of the amount determined under (A) above: Provided, however, That if it appears that the Contractor would have sustained a loss on the entire contract had it been completed, no profit shall be included or allowed under this subdivision (C) and an appropriate adjustment shall be made reducing the amount of the settlement to reflect the indicated rate of loss; and

(3) The reasonable costs of settlement, including accounting, legal, clerical, and other expenses reasonably necessary for the preparation of settlement claims and supporting

data with respect to the terminated portion of the contract and for the termination and settlement of subcontracts thereunder, together with reasonable storage, transportation, and other costs incurred in connection with the protection or disposition of property allocable to this contract.

The total sum to be paid to the Contractor under (1) and (2) of this paragraph (e) shall not exceed the total contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated. Except for normal spoilage, and except to the extent that the Government shall have otherwise expressly assumed the risk of loss, there shall be excluded from the amounts payable to the Contractor as provided in (e) (1) and (2) (A) above, the fair value, as determined by the Contracting Officer, of property which is destroyed, lost, stolen, or damaged so as to become undeliverable to the Government, or to a buyer pursuant to paragraph (b) (7). (f) Any determination of costs under paragraph (c) or (e) hereof shall be governed by the principles for consideration of costs set forth in Section XV, Part 2, of the Armed Services Procurement Regulation, as in effect on the date of this contract.

(g) The Contractor shall have the right of appeal, under the clause of this contract entitled "Disputes," from any determination made by the Contractting Officer under paragraphs (c) or (e) above, except that if the Contractor has failed to submit its claim within the time provided in paragraph (c) above and has failed to request extension of such time, it shall have no such right of appeal. In any case where the Contracting Officer has made a determination of the amount due under paragraph (c) or (e) above, the Government shall pay to the Contractor the following: (1) If there is no right of appeal hereunder or if no timely appeal has been taken, the amount so determined by the Contracting Officer, or (11) if an appeal has been taken, the amount finally determined on such appeal.

(h) In arriving at the amount due the Contractor under this clause there shall be deducted (1) all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract, (ii) any I claim which the Government may have against the Contractor in connection with this contract, and (iii) the agreed price for, or the proceeds of sale of, any materials, supplies, or other things acquired by the Contractor or sold, pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Government.

(1) If the determination hereunder be partial, prior to the settlement of the terminated portion of this contract, the Contractor may file with the Contracting Officer a request in writing for an equitable adjustment of the price or prices specified in the contract relating to the continued portion

of the contract (the portion not terminated by the Notice of Termination), and such equitable adjustment as may be agreed upon shall be made in such price or prices.

(1) The Government may from time to time, under such terms and conditions as it may prescribe, make partial payments and payments on account against costs incurred by the Contractor in connection with the terminated portion of this contract whenever in the opinion of the Contracting Officer the aggregate of such payments shall be within the amount to which the Contractor will be entitled hereunder. If the total of such payments is in excess of the amount finally agreed or determined to be due under this clause, such excess shall be payable by the Contractor to the Government upon demand, together with interest computed at the rate of 6 percent per annum, for the period from the date such excess payment is received by the Contractor to the date on which such excess is repaid to the Government: Provided, however, That no interest shall be charged with respect to any such excess payment attributable to a reduction in the Contractor's claim by reason of retention or other disposition of termination inventory until ten days after the date of such retention or disposition, or such later date as determined by the Contracting Officer by reason of the circumstances.

(k) Unless otherwise provided for in this contract, or by applicable statute, the Contractor, from the effective date of termination and for a period of three years after final settlement under this contract, shall preserve and make available to the Government at all reasonable times at the Office of the Contractor but without direct charge to the Government, all its books, records, documents, and other evidence bearing on the costs and expenses of the Contractor under this contract and relating to the work terminated hereunder, or, to the extent approved by the Contracting Officer, photographs, micro-photographs, or other authentic reproductions thereof.

(b) In fixed-price incentive contracts, paragraph (1) set forth below shall be added to the clause set forth in paragraph (a) of this section:

(1) Insofar as items under this contract are subject to incentive price revision and the total final price for such items has not been established under the incentive price revision clause of this contract, the total contract price shall include, for the purpose of paragraphs (d) and (e) of this clause, the amount which the total final price for such items may not exceed under the incentive price revision clause.

(c) The following clause paragraphs shall be used in place of clause paragraphs (e) and (f) of the clause in paragraph (a) of this section when the contract is for construction in excess of $10,000.

(e) In the event of the failure of the Contractor and the Contracting Officer to agree as provided in paragraph (d) upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this clause, the Contracting Officer shall, subject to any Settlement Review Board Approvals required by Section VIII of the Armed Services Procurement Regulation in effect as of the date of execution of this contract, determine, on the basis of information available to him, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined as follows:

(1) with respect to all contract work performed prior to the effective date of the Notice of Termination, and total (without duplication of any items) of

(A) the cost of such work;

the

(B) the cost of settling and paying claims arising out of the termination of work under subcontract or orders as provided in paragraph (b) (v) above, exclusive of amounts paid or payable on account of supplies or materials delivered or services furnished by the subcontractor prior to the effective date of the Notice of Termination of Work under this contract, which amounts shall be included in the cost on account of which payment is made under (A) above; and (C) a sum, as a profit, equal to 2 percent of the part of the amount determined under (A) above which represents the cost of articles or materials delivered to the site but not incorporated in the work in place on the effective date of the Notice of Termination, plus a sum equal to 8 percent of the remainder of such amount, but the aggregate of such sums shall not exceed 6 percent of the whole of the amount determined under (A) above: Provided, however, That if it appears that the contractor would have sustained a loss on the entire contract had it been completed, no profit shall be included or allowed under this subdivision (C) and an appropriate adjustment shall be made reducing the amount of the settlement to reflect the indicated rate of loss; and

(ii) the reasonable cost of the preservation and protection of property incurred pursuant to paragraph (b)(ix); and any other reasonable cost incidental to determination of work under this contract, including expense incidental to the determination amount due to the Contractor as the result of the termination of work under this contract.

of the

The total sum to be paid to the contractor under (1) above shall not exceed the total contract price as reduced by the amount of payments otherwise made and as further

reduced by the contract price of work noth terminated. Except for normal spoilage, and p except to the extent that the Government shall have otherwise expressly assumed ther risk of loss, there shall be excluded from the amounts payable to the contractor under (1) above, the fair value, as determined by the contracting officer, of property which is destroyed, lost, stolen, or damaged so as to become undeliverable to the Government, or to a buyer pursuant to paragraph (b) (vii).z (f) Any determination of costs under paragraph (c) or (e) hereof shall be governed by the principles for consideration of costs set forth in Section XV, Part 4, of the Armed Services Procurement Regulation, as in effect on the date of this contract.

(d) In any contract for ArchitectEngineer services in excess of $10,000, the clause in paragraph (a) of this section as modified by paragraph (c) of this section shall be used, the term "Architect-Engineer" shall be substituted for the term "Contractor", and the following paragraph (e) shall be used in place of paragraph (e) therein:

(e) In the event of the failure of the Architect-Engineer and the Contracting Officer to agree as provided in paragraph (d) upon the whole amount to be paid to the Architect-Engineer by reason of the termination of work pursuant to this clause, the Contracting Officer shall, subject to any Settlement Review Board approvals required by Section VIII of the Armed Services Procurement Regulation in effect as of the date of execution of this contract, determine, on the basis of information available to him, the amount, if any, due to the Architect-Engineer by reason of the termination and shall pay to the Architect-Engineer the amounts determined as follows:

(i) For completed work and services accepted by the Government, the price or prices specified in the contract for such work, less any payments previously made; (ii) The total of

(A) the costs incurred in the performance of the work and services terminated, including initial costs and preparatory expenses allocable thereto, but exclusive of any costs attributable to the work and services paid or to be paid for under paragraph (e) (i) hereof;

(B) the cost of settling and paying claims arising out of the termination of work or services under subcontracts or orders as provided in paragraph (b)(v) above, which are properly chargeable to the terminated portion of the contract (exclusive of amounts paid or payable on account of work or services delivered or furnished by subcontractors prior to the effective date of termination, which amounts shall be included in the costs payable under (A) above); and

(C) a sum, as a profit, equal to 6 percent of the whole of the amount determined under (A) above; provided, however, that if it

against costs incurred by the Contractor in connection with the terminated portion of this contract, whenever, in the opinion of the Contracting Officer, the aggregate of such payments is within the amount to which the Contractor will be entitled hereunder. If the total of such payments is in excess of the amount finally agreed or determined to be due under this clause, such excess shall be payable by the Contractor to the Government upon demand: Provided, That if such excess is not so paid upon demand, interest thereon shall be payable by the contractor to the Government at the rate of 6 percent per annum, beginning 30 days from the date of such demand.

(g) The Contractor agrees to transfer title and deliver to the Government, in the manner, at the time, and to the extent, if any, directed by the Contracting Officer, such information and items which, if the contract had been completed, would have been required to be furnished to the Government, including:

(1) Completed or partially completed plans, drawings and information; and

(2) Materials or equipment produced or in process or acquired in connection with the performance of the work terminated by the notice.

Other than the above, any termination inventory resulting from the termination of the contract may, with the written approval of the Contracting Officer, be sold or acquired by the Contractor under the conditions prescribed by and at a price or prices approved by the Contracting Officer. The proceeds of any such disposition shall be applied in reduction of any payments to be made by the Government to the Contractor under this contract or shall otherwise be credited to the price or cost of work covered by this contract or paid in such other manner as the Contracting Officer may direct. Pending final disposition of property arising from the termination, the Contractor agrees to take such action as may be necessary, or as the Contracting Officer may direct, for the protection and preservation of the property related to this contract which is in the possession of the Contractor and in which the Government has or may acquire an interest.

(h) Any disputes as to questions of fact which may arise hereunder shall be subject to the "Disputes" clause of this contract. [25 F.R. 14231, Dec. 31, 1960, as amended at 26 F.R. 2612, Mar. 28, 1961; 26 F.R. 9639, Oct. 12, 1961]

§ 8.704-2 Suggested clause for subcon

[merged small][merged small][ocr errors]

corporate, or are negotiated on the basis of, the cost principles set forth in Part 15, Subpart C of this chapter; and Provided further, such subcontracts are placed on the no-fee or no-profit basis. [25 F.R. 14232, Dec. 31, 1960]

§ 8.705 Short form termination clauses for fixed-price type contracts. [25 F.R. 14232, Dec. 31, 1960]

§ 8.705-1 Supply and service contracts. In order to facilitate:

(a) The handling of purchases under fixed-price supply contracts not to exceed $10,000; and

(b) The obtaining of services where it is intended that a termination claim will not be made in the event of termination for the convenience of the Government, such as contracts for, but not limited to, rental of unreserved garage space, meals for inductees, laundry, and dry-cleaning services;

the short form termination clause set forth below is authorized for use in lieu of any other clause providing for termination for the convenience of the Government; provided, such contracts obligate the Government to order or otherwise to be liable for a minimum quantity:

TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (JAN. 1960)

The Contracting Officer, by written notice, may terminate this contract, in whole or in part, when it is in the best interest of the Government. If this contract is for supplies and is so terminated, the Contractor shall be compensated in accordance with ASPR Section VIII, in effect on this contract's date. To the extent that this contract is for services and is so terminated, the Government shall be liable only for payment in accordance with the payment provisions of this contract for services rendered prior to the effective date of termination. [25 F.R. 14232, Dec. 31, 1960] § 8.705-2

Construction contracts.

Generally, there is no need for a termination clause in construction contracts not in excess of $10,000. However, where the contracting officer determines that a termination clause should be included in such a contract, the following clause shall be used:

TERMINATION FOR CONVENIENCE OF THE
GOVERNMENT (JANUARY 1965)

The Contracting Officer, by written notice, may terminate this contract, in whole or in part, when it is in the interest of the Government. If this contract is so terminated,